My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARDSEP03
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARDSEP03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:21:30 PM
Creation date
6/27/2007 12:49:03 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/22/2003
Description
Petition to Enforce the Provisions of the Blue River Decree
Board Meetings - Doc Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />O ':):')/". ,"'i 6 <br />uiJc.I <br /> <br />e <br /> <br />4. From Lake Granby, C-BT Project water is pumped first into Shadow Mountain <br />Reservoir and then flows by gravity into Grand Lake. At Grand Lake, the water <br />flows by gravity beneath the Continental Divide tluough the Alva B. Adams <br />TUIUlel (the ""Adams Tunnel"). Once the water is delivered to the East Slope, it <br />is stored in several reservoirs and released to river systems where it is available <br />for use by owners of contractual commitments from the Project. A <br />representation of the C-BT Project components is shown below. <br /> <br /> <br /> <br />.", T.: <br /> <br />('- <br /> <br />",.. <br /> <br />Lontinental <br /> <br />Div\6~ ': ~~ <br /> <br />";.,.,.. <br /> <br />,~ <br /> <br />. <br /> <br />G4IIEN '~,. <br />MOUNTAIN <br />IIESlRVOIR <br /> <br />0- <br />1.",_.1 <br />Airport <br /> <br />IJ <br />',)00 <br />",-:" <br /> <br />. <br /> <br />5. The authorizing legislation for the C-BT Project requires that the C-BT Project <br />be constructed and operated in conformance with the requirements of Senate <br />Document 80. The complete title of Senate Document 80 is Synopsis of Report <br />on Colorado Big Thompson Project, Plan of Development and Cost Estimate <br />Prepared by the Bureau of Reclamation, Department of the Interior, 75th <br />Congress, First Session, June 15, 1937. The portion of Senate Document 80 <br />entitled "'Manner of Operation of Project Facilities and Auxiliary Features" <br />provides that the C-BT Project was to preserve ""the rights and interests <br />dependent on this water, which exist on both slopes of the Continental Divide in <br />Colorado." I d. at 2-3 (Excerpts from Senate Document 80 are attached as <br />Exhibit A). <br /> <br />6. The obligations imposed by Senate Document 80 have long been acknowledged <br />by Reclamation, as well as by this and other Courts. See, e.g., Reclamation's <br />Operating Policy for Green Mountain Reservoir (""The Bureau of Reclamation <br />has the responsibility to operate and maintain the C-BT Project in accordance <br />with the provisions of Senate Document 80.") 48 Fed. Reg. 56657 (Dec. 22, <br />1983); Public Service Co. of Colorado v. Federal Energy Regulatory Comm 'n, <br />754 F.2d 1555, 1561 (loth Cir. 1985). <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.