Laserfiche WebLink
<br /> <br />Federal Emergency Management Agency <br />Washington, D.C. 20472 <br /> <br />CERTIFIED MAIL <br />RETURN RECEIPT REQUESTED <br /> <br />IN REPLY REFER TO: <br />Case No.: 98-08-333P <br /> <br />The Honorable Alan Staehle <br />Chairman, Ouray County <br />Board of Commissioners <br />P.O. Box C <br />Ouray, Colorado 81427 <br /> <br />Community: Ouray County, Colorado <br />Community No.: 080136 <br />Panel Affected: 0316 A <br />Effective Date of NOVO 9 1998 <br />This Revision: <br /> <br />102-D-A <br /> <br />Dear Mr. Staehle: <br /> <br />This responds to a request that the Federal Emergency Management Agency (FEMA) revise the effective <br />Flood Insurance Rate Map (FIRM) and Flood Insurance Study (FIS) report for your community in <br />accordance with Part 65 of the National Flood Insurance Program (NFIP) regulations. In a letter dated <br />June 8, 1998, Mr. David Vince, Parks Director, City of Ouray, requested that FEMA revise the FIRM <br />and FIS report to show the effects of the North Ouray Uncompahgre River Restoration Project along the <br />Uncompahgre River from approximately 2,800 feet downstream to approximately 1,700 feet upstream of <br />the confluence with Bridalveil Creek. This request follows up on a Conditional Letter of Map Revision <br />issued on June 14, 1996. <br /> <br />All data required to complete our review of this request were submitted with letters from Mr. Vince. <br /> <br />We have completed our review of the submitted data and the flood data shown on the effective FIRM and <br />in the effective FIS report. We have revised the FIRM and FIS report to modify the floodplain boundary <br />delineations of the flood having a I-percent chance of being equaled or exceeded in any given year (base <br />flood) along the Uncompahgre River from approximately 3,000 feet downstream to approximately 2,850 <br />feet downstream of the confluence with Bridalveil Creek. As a result of the modifications, the width of <br />the Special Flood Hazard Area (SFHA), the area that would be inundated by the base flood, for the <br />Uncompahgre River decreased. The modifications are shown on the enclosed annotated copies of FIRM <br />Panel(s) 0316 A and Profile Panel(s) 13P. This Letter of Map Revision (LOMR) hereby revises the <br />above-referenced panel(s) of the effective FIRM and the affected portions of the FIS report, both dated <br />July 3, 1985. <br /> <br />Because this revision request also affects the City of Ouray, a separate LOMR for that community was <br />issued on the same date as this LOMR. <br /> <br />The modifications are effective as of the date shown above. The map panel(s) as listed above and as <br />modified by this letter will be used for all flood insurance policies and renewals issued for your community . <br />