Laserfiche WebLink
<br />. <br /> <br />... 4-5 <br />... 4-8 <br />4-10 <br />4-12 <br />4-12 <br />4-14 <br />4-15 <br />4-16 <br />4-20 <br />4-22 <br />4-24 <br />4-25 <br />4-26 <br />4-27 <br />4-28 <br />4-30 <br />4-30 <br />4-32 <br />4-34 <br />4-34 <br />4-43 <br />4-48 <br /> <br /> <br />5-2 <br /> <br />Del Norte Flood Protection Alternatives.................................. <br />Schematic of a Grade Control Structure................................. <br />Typical Reach C Channel Meander Reconnection ................. <br />Plan View of Diversion Consolidation from Monte Vista Canal to Consolidated Slough <br />Summed Cumulative Decree Rights of Proposed Consolidated Slough .................. <br />Centennial and Empire Ditch Consolidation ............................................................ <br />Existing Gunbarrel Bridge......... .............................................................................. <br />Proposed Improvements at Gunbarrel Road ........................................................... <br />Typical Reach D Geomorphic Modifications Downstream of San Luis Valley Canal <br />Channel Restoration Opportunities in Reach E ............................................. <br />Wasteway Structure Examples (Alsenbrey, et. AI., 1978).............................. <br />North Farm Road Setback Levee Near Mesa Verde ..................................... <br />Fourmile Road/CR 107 Setback Levees Near Alamosa ................................ <br />Location of Excelsior, Costilla, Independent and Westside Consolidation ..... <br />Summed Cumulative Decree Rights of Proposed Ditch Consolidation .......... <br />Diversion Rights of Westside Ditch and Possible Pumping Stations.............. <br />Conveyance Alternatives for Wests ide Diversion Low-Lift Pump Alternatives <br />Plan View of Empire Extension Alternatives for the Westside Diversion <br />Alamosa Levee System Improvements ................................... <br />Drain Valve Options ................................................................ <br />Sample Multipurpose Riparian Buffer Design .......................... <br />Outline for Upper Rio Grande Watershed Management Study <br /> <br />Implementing <br /> <br />Organizations and Their Primary Responsibilities for <br />Non-Structural Projects <br /> <br />. <br /> <br />3-10 <br /> <br />. <br /> <br />Figure 4-1. <br />Figure 4-2. <br />Figure 4-3. <br />Figure 4-4. <br />Figure 4-5. <br />Figure 4-6. <br />Figure 4-7. <br />Figure 4-8. <br />Figure 4-9. <br />Figure 4-10. <br />Figure 4-11. <br />Figure 4-12. <br />Figure 4-13. <br />Figure 4-14. <br />Figure 4-15. <br />Figure 4-16. <br />Figure 4-17. <br />Figure 4-18. <br />Figure 4-19. <br />Figure 4-20. <br />Figure 4-21. <br />Figure 4-22. <br /> <br />Figure 5- <br /> <br />ES-3 <br />ES-4 <br />ES-7 <br />ES-7 <br />ES-8 <br /> <br />ES-23 <br /> <br />.....2-8 <br />.....2-9 <br />...2-10 <br />....2-12 <br />....2-13 <br />....2-15 <br />....2-15 <br />..........2-19 <br />..........2-19 <br />..........2-20 <br />..........2-20 <br />...........2-22 <br />............2-22 <br />............2-24 <br /> <br />............2-27 <br />............2-29 <br />............2-31 <br />............2-32 <br />.............2-34 <br />.......2-36 <br />.......2-37 <br /> <br />Implementing <br /> <br />RGHRP Study Area and San Luis Valley Map <br />Rio Grande Compact Delivery Requirements versus Annual Index Flows <br /> <br />at Del Norte Gage .................................................................................. <br />Coverage of Available Floodplain Mapping Along the Rio Grande ......... <br />Types of Available Floodplain Mapping Along the Rio Grande............... <br />State Street Bridge, Alamosa................................................................. <br />Alamosa Levees, Looking Upstream from State Street .......................... <br />Grade Control Structure at Wrightmuth Site on Alamosa River .............. <br />Bendway Weir at Rosgen Site on Alamosa River................................... <br />Rio Grande Mean Annual Flow, All Gages (Period-of-Record)............... <br />Rio Grande Daily Flow Duration Curves (Period-of-Record) .................. <br />Variability in Mean Daily Flow, Rio Grande Near Del Norte (1968-1998) <br />Variability in Mean Daily Flow, Rio Grande at Alamosa (1968-998) <br />Annual Peak Flows at the Del Norte and Alamosa Gages..... <br />Peak Discharges Along the Rio Grande................................ <br />Example of River Inventory GIS Coverage............................ <br />Structure Built in Floodplain Near South Fork ....................... <br />Rio Grande Channel Profile .................................................. <br />Looking Upstream at Reach A Near South Fork ................... <br />Reach Bl - Upstream of Farmers Union Canal Headgate.... <br />Reach B2 - Downstream of Del Norte .................................. <br />Reach D - Downstream of Stoeber Lane Bridge................... <br />Reach E - Upstream of Costilla Ditch Diversion ................... <br /> <br />of Figures <br /> <br />RGHRP Study Area and San Luis Valley Map <br />Rio Grande Channel Profile .................................................... <br />Rio Grande Mean Annual Flow, All Gages (Period-of-Record) <br />Peak Discharge Along the Rio Grande................. <br />Structures within the Floodplain ........................... <br />Organizations and Their Primary Responsibilities <br />Non-Structural Projects <br /> <br />RGHRP Location Map <br /> <br />for <br /> <br />Figure ES-l. <br />Figure ES-2. <br />Figure ES-3. <br />Figure ES-4. <br />Figure ES-5. <br />Figure ES-6. <br /> <br />Figure <br /> <br />Figure 2-1. <br />Figure 2-2. <br /> <br />Figure 2-3. <br />Figure 2-4. <br />Figure 2-5. <br />Figure 2-6. <br />Figure 2-7. <br />Figure 2-8. <br />Figure 2-9. <br />Figure 2-10. <br />Figure 2-11. <br />Figure 2-12. <br />Figure 2-13. <br />Figure 2-14. <br />Figure 2-15. <br />Figure 2-16. <br />Figure 2-17. <br />Figure 2-18. <br />Figure 2-19. <br />Figure 2-20. <br />Figure 2-21. <br />Figure 2-22. <br /> <br />List <br /> <br />..3-4 <br />3-7 <br />3-8 <br /> <br />..........3-12 <br />..........3-13 <br />..........3-14 <br />....3-18 <br />....3-20 <br />...3-21 <br /> <br />Flowchart of Sub-Reach Weighted Average Scoring. <br />Bank-Full Capacity and Recurrence Interval............ <br />Comparison of Calculated and Mapped Floodplains <br />Structures within the Floodplain ............................. <br />Flow Characteristics for the 100- Year Flood Event <br />Floodplain in Del Norte ......................................... <br />Floodplain at Upstream End of Alamosa Levees... <br />Structures Affected by Delivery of Compact Flows <br />Flow Characteristics for Compact Deliveries ........ <br />Gage Shifts for Rio Grande Near Del Norte Gage <br />Gage Shifts for Rio Grande Near Monte Vista <br />Gage Shifts for Rio Grande at Alamosa Gage <br /> <br />Figure 3-1. <br />Figure 3-2. <br />Figure 3-3. <br />Figure 3-4. <br />Figure 3-5. <br />Figure 3-6. <br />Figure 3-7. <br />Figure 3-8. <br />Figure 3-9. <br />Figure 3-10. <br />Figure 3-11. <br />Figure 3-12. <br />