My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Microsoft PowerPoint - EricKuhnPresentation041906Yampa_White
CWCB
>
Board Meetings
>
Backfile
>
Backfile
>
Microsoft PowerPoint - EricKuhnPresentation041906Yampa_White
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2010 8:42:54 AM
Creation date
6/15/2007 12:28:27 PM
Metadata
Fields
Template:
Basin Roundtables
Basin Roundtable
Yampa/White
Title
Inter- vs. Intra- Basin Compacts
Date
4/19/2006
Author
Eric Kuhn
Basin Roundtables - Doc Type
Presentations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Different Scenarios <br />1) Noah ’ s estimate: <br />0.5175 X (7,500,000 – 50,000) = 3,855,000 AF <br />2) Reclamation ’ s hydrologic determination: <br />0.5175 X (6,000,000 – 50,000) = 3,079,000 AF <br />A ssumes a Lee Ferry delivery of 8.25 MAF/year <br />( 7,500,000 AF for the Lower Basin plus 750,000 AF for Mexico) <br />Based on the 1954 - 1965 hydrology <br />Reclamation assumes a 11,600,000 AF ave. undepleted inflow <br />to Lake Powell <br />3) The 1965 hydrology with no deliveries from Upper <br />Basin to Mexico – approximately 3,450,000 AF <br />Bottom Line <br />Colorado is using about 2.4 to 2.7 MAF per year. <br />• <br />Colorado has about 500KAF left for development. <br />• <br />Assuming <br />Future hydrology will look like the recent past. <br />• <br />The Upper Basin delivery obligation is 8.23 MAF <br />• <br />per year. <br />CO River Water Conservation District <br />www.crwcd.org 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.