Laserfiche WebLink
<br />Section 10 <br />Evaluation Framework <br /> <br />'.IlL <br /> <br />A draft list of water management objectives was <br />developed by the SWSI team. These objectives were <br />modified significantly based on comments provided by <br />the CWCB, the SWSI Basin Roundtables, and public <br />input <br /> <br />The final set of water management objectives is shown in <br />Figure 10-4, not listed in any particular order. Each Basin <br />Roundtable member was asked to provide his or her own <br />relative preference for each objective, as described in <br />Section 10.4. <br /> <br /> <br />Figure 10-4 <br />SWSI Water Management Objectives <br /> <br />Each of these objectives has one or more sub-objectives <br />that help further define the goal. Once the objectives <br />were defined, performance measures were developed to <br />indicate how well the objective and its sub-objectives <br />were being achieved. These performance measures <br />were used to score and rank the options before <br />alternatives can be built <br /> <br />CONI <br /> <br />10-4 <br /> <br />Termed "Comply with All Applicable Laws, Regulations, <br />and Water Rights," the ninth water management <br />objective, was developed based on input from the Basin <br />Roundtable Technical meetings. Each option developed <br />under SWSI will comply with applicable laws and <br />regulations, the water rights system, and individual <br />rights. This ninth objective was thus included as a <br />baseline requirement but was not used to compare <br />options. It instead represents a minimum condition or <br />"gate" that all alternatives must pass through to be <br />considered for implementation. <br /> <br />Recognizing that SWSI is a reconnaissance-level <br />process and that feasibility studies would likely be <br />needed before implementation of the options evaluated, <br />two sets of performance measures were developed. <br /> <br />The first set of performance measures was developed to <br />evaluate options for consideration in SWSI. These are <br />qualitative performance assessments that were made <br />based on engineering judgment, using the best available <br />information. <br /> <br />The second set of performance measures could be used <br />as projects move toward implementation, for more <br />detailed feasibility-level planning in which specific options <br />will be evaluated prior to implementation. These <br />performance measures are more quantitative and would <br />rely more heavily on the state's DSS and other more <br />refined data and information. <br /> <br />Table 10-1 summarizes the water management <br />objectives, sub-objectives, and associated performance <br />measures for SWSI. <br /> <br />S:\1177\Basin Reports\North Platte\S10_North Platte.doc <br />