My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NorthPlatte-March07Agenda
CWCB
>
Board Meetings
>
Backfile
>
Backfile
>
NorthPlatte-March07Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 4:17:09 PM
Creation date
6/13/2007 11:03:27 AM
Metadata
Fields
Template:
Basin Roundtables
Basin Roundtable
North Platte
Title
Meeting Agenda
Date
3/27/2007
Basin Roundtables - Doc Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1.6 North Platte Basin Roundtable <br />Summary of North Platte Basin Roundtable Request <br />The North Platte Basin Roundtable has requested that a work plan be developed <br />to address the following items: <br />1) Quantify unappropriated water available in the North Platte River basin. This <br />includes identifying unappropriated water for all beneficial uses and will require <br />quantification by tributary at various locations and times of the year. <br /> <br />2) Identify and quantify the non-consumptive uses and needs in the basin <br />3) Address North Platte Basin high altitude crop consumptive use coefficients <br /> <br />North Platte Basin Roundtable Tasks Authorized under Task Order 2007-003 <br />The Consultant will meet with needs assessment subcommittee two times in <br />person and two times via conference call during March 2007 through June 30, <br />2007 to define what elements need to be contained in their work plan. The <br />Consultant will develop draft sections of the work plan based on these input <br />from these meetings. The Consultant will use information from SWSI 2 to <br />address work plan elements 1, 2 and 3 above. In addition, the work plan for non- <br />consumptive needs developed in the Colorado Basin should be considered for <br />the North Platte Basin. For all work plan elements, a common technical platform <br />will be considered by the Consultant. <br /> <br />Deliverable: Draft and final work plan addressing the roundtable's 3 elements <br />outlined above. <br />Associated fee: $35,000 <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.