Laserfiche WebLink
<br />Lake Henry Reservoir Company <br />November 28, 2001 <br /> <br />Page 2 <br /> <br />c) You must adhere to the CWCB Design and Construction Administration Procedures. Tim <br />Feehan will contact you regarding the CWCB requirements concerning project bidding, <br />design, and construction. Tim will make construction inspections, which will be the basis of <br />the monthly pay estimates for disbursement of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a loan from the Colorado <br />Water Conservation Board. <br /> <br />SiPl!~u/t <br /> <br />Mike Serlet, PE, Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />Attachments: <br /> <br />Updated Memo: Lake Henry 1101mmo <br /> <br />cc (w/Attachment): <br /> <br />Mr. Harold E, Miskel, Board Member, Colorado Water Conservation Board <br />Michael Miller, PE, URS Corp., 8181 East Tufts Ave., Denver, CO 80237 <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />c: Projects\Proj-New\Lake Henry 1101 Ltr <br /> <br />, <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />