My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150082 Approval letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150082 Approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2011 1:24:06 PM
Creation date
5/28/2007 10:30:33 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150082
Contractor Name
Consolidated Home Supply Ditch and Reservoir Company, The
Contract Type
Loan
Water District
3
County
Larimer
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />, <br /> <br />l.. <br /> <br />Consolidated Home Supply Ditch and Reservoir Co, <br />September 24-25, 2001 <br /> <br />Agenda Item 16a, <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: <br /> <br />Consolldat~d Home Supply Ditch & Res, Co, <br /> <br />County: Larimer <br /> <br />Project Name:' <br /> <br />. Mariano Dam <br /> <br />Project Type: <br /> <br />Rehabilitation <br /> <br />Drainage Basin: <br /> <br />South Platte <br /> <br />Water Source: <br /> <br />Big Thompson River <br /> <br />Total Project Cost: $1,048,000 <br /> <br />,Funding Sources: CWCB <br /> <br />Type of Borrower: Agricultural/Municipal <br />CWCB Emergency Loan: $943,000 <br /> <br />Median Household Income: Low <br /> <br />Interest Rate: 3,5% <br /> <br />Term: 30 years. <br /> <br />cweB Grant: $5,000 <br /> <br />Year 2000 total diversions: 23,631 acre-feet <br /> <br />The Consolidated Home Supply Ditch and Reservoir Company operates the Mariano dam and <br />Reservoir for the benefit of its 275 shareholders and provides direct flow and storage irrigation <br />water to a 16,500-acre service area, The diversion and headgate ,are located on the Big <br />Thompson River and the Reservoir is located about 2,5 miles southwest of Loveland, A slide <br />occurred on the downstream slope of the dam in June 2001, and the reservoir has been emptied <br />for emergency repairs. Work needs to be completed in fall-winter 2001 to allow storage for the <br />2002 irrigation season. The reservoir has a capacity of 5,784 ac-ft, and total system diversions <br />were 23,631ac-ft in 2001.The Consolidated Home Supply Ditch and Reservoir Company is a <br />mutual ditch company and a nonprofit corporation registered in the State of Colorado. Rocky <br />Mountain Consultants has completed preliminary plans and specifications for the project and <br />the feasibility study. Proposed funding for the project consists of aCWCB Emergency Loan for <br />$943,000 and a $5,000 CWCB grant for the feasibility study, <br /> <br /> <br />"4'X'! \ , <br />~X\a~ rries; rtl <br />~_ 1 \' 't <br />" \ J \ <br />~ '( <br />.. <br /> <br />" <br /> <br />E) <br />2 <br /> <br />" <br />~ <br /> <br />vllClJ <br /> <br />\ <br />, <br /> <br /> <br />" <br />'" <br />~ <br /> <br />g la,._ lil <br /> <br />, <br />, <br />',\ <br /> <br />Location Map <br />6 <br /> <br />,\ <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.