My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01422 (2)
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01422 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 2:37:07 PM
Creation date
5/25/2007 2:38:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150133
Contractor Name
Low Line Ditch Company, The
Contract Type
Loan
Water District
64
County
Logan
Bill Number
MC3
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Low Line Ditch Company <br />January 22-23, 2003 <br /> <br />Agenda Item 19h <br />(Updated January 28, 2003) <br /> <br />Selected Alternative 3 consists of the following: <br /> <br />. Four recharge ponds will be constructed along the Low Line Ditch. Ponds will be located <br />on ground that is considered low value and currently not used for growing irrigated <br />crops, <br /> <br />. Each pond will have a turnout built into the ditch which will include a measuring device <br />with a recorder. Proper measurement is a requirement of the Division of Water <br />Resources. <br /> <br />. The augmentation well would be drilled away from the river and next to the ditch. The <br />well could be pumped directly into the Low Line ditch or by using an existing drainage <br />way could be pumped into the South Platte River. <br /> <br />The implementation schedule calls for completion of financing arrangements and final design in <br />January 2003. Construction would be completed by March 2003. <br /> <br />Financial Analvsis <br />The total estimated cost of the project is $105,000 (including engineering costs). Water is used <br />for agricultural purposes and the Staff is recommending a Small Project loan in maximum <br />amount of $94,500. The recommended loan terms are 30 years at 2.75% or 20 years at 2.5%, <br />at the borrower's option. <br /> <br />Table 1 is a summary of the financial aspects of the project with a $94,500 CWCS Loan. The <br />annual payment would be $5,134 (including the j 0% reserve requirement) at the loan terms of <br />2.75% for 30 years. This represents $0.77 per acre-foot, based on average annual diversions of <br />6,650 acre-feet. <br /> <br />Table 1. Financial Summary <br /> <br />Proiect Cost $105,000 <br />Number of Shareholders 14 <br />Number of Shares of Stock 320 <br />CWCS Loan Amount $94,500 <br />CWCS Loan Pavment (includes 10% reserve) $5,134 <br />Current assessment per share $25 <br />New assessment per share $41 <br />Annual Loan Cost per acre-foot (Average diversions 6,650 ac-ft.) $0.77 <br /> <br />Credit worthiness: The LLDC has no existing debt. Table 2 shows the Financial Ratios for the <br />LLDC and indicates, with the exception of Cash Reserves, average to strong ability to repay a <br />$94,500 cwes loan with the project in place. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.