Laserfiche WebLink
<br />FLOOD INSURANCE STUDY <br />CITY OF DELTA, DELTA COUNTY, COLORADO <br /> <br />1.0 INTRODUCTION <br /> <br />1.1 Purpose of Study <br /> <br />This Flood Insurance Study revises and updates a previous Flood <br />Insurance Study/Flood Insurance Rate Map for the City of Delta, <br />Delta County, Colorado. This information will be used by the City <br />of Delta to update existing floodplain regulations as part of the <br />Regular Phase of the National Flood Insurance Program (NFIP). The <br />information will also be used by local and regional planners to <br />further promote sound land use and floodplain development. <br /> <br />In some ,states or communities, floodplain management criteria or <br />regulations" may exist that are more restrictive or comprehensive <br />than the minimum Federal requirements. In such cases, the more <br />restrictive criteria take precedence and the State (or other <br />jurisdictional agency) will be able to explain them. <br /> <br />1.2 Authority and Acknowledgments <br /> <br />The s~urces of authori ty for this Flood Insurance Study are the <br />National Flood Insurance Act of 1968 and the Flood Disaster <br />Protection Act of 1973. <br /> <br />The hydrologic and hydraulic analyses for the original study were <br />performed by MSM Consultants, Inc., for the Federal Emergency <br />Management Agency (FEMA) , under Contract No. H-4710. This work, <br />which was completed in February 1982, covered all significant <br />flooding sou~ces affecting the City of Delta. <br /> <br />The hydrologic and hydraulic analyses for the Gunnison Ri ver were <br />performed for FEMA by the u.s. Army Corps of Engineers, Sacramenta <br />District, under Interagency Agreement EMW-88-E-2768. This restudy <br />was completed in May 1989. <br /> <br />1.3 Coordination <br /> <br />An initial coordination meeting was held in the City of Delta on <br />March 23, 1978. This meeting, attended by representatives of the <br />City of Delta, FEMA, and the study contractor, was held to discuss <br />the, nature and purpose of the original study and the scope and <br />limits of work. <br /> <br />On January 25, 1979, an intermediate coordination meeting was held <br />to discuss the progress of the study and the limits of work. In <br />attendance were representatives of the City of Delta, FEMA, and the <br />study:contractor. <br />