My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10684 (2)
CWCB
>
Floodplain Documents
>
Backfile
>
10001-11000
>
FLOOD10684 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:39:50 PM
Creation date
5/21/2007 2:50:12 PM
Metadata
Fields
Template:
Floodplain Documents
County
Clear Creek
Community
Clear Creek County and Unincorporated Areas
Title
FIS - Clear Creek County and Incorporated Areas
Date
3/19/2007
Prepared For
Clear Creek County
Prepared By
FEMA
Floodplain - Doc Type
Current FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Town of Silver Plume <br /> <br />City of Idaho Springs <br /> <br />The hydraulic analyses for this study were <br />performed by the u.s. Army Corps of Engineers <br />(USACE), Omaha District, for the Federal <br />Emergency Management Agency (FEMA), under <br />Interagency Agreement EMW -89-E-2994. The <br />hydrologic analyses for this study were provided <br />by the CWCB. The restudy was completed in <br />February 1999. <br /> <br />The hydraulic analyses for this study were <br />performed by Black and Veatch, Consulting <br />Engineers, for the Federal Insurance <br />Administration (FIA), under contract No. H- <br />3834. This work was completed in March 1978. <br /> <br />The Town of Empire and the unincorporated areas of Clear Creek County did not <br />previously have FISs published. <br /> <br />1.3 Coordination <br /> <br />Table 1, "Initial and Final CCO Meeting Dates" <br /> <br />Community Name <br />Town of Georgetown <br />City of Idaho Springs <br />Town of Silver Plume <br />* Data not available <br /> <br />Initial CCO <br />Meeting Date <br />* <br /> <br />Final ceo Meeting Date <br />May 24, 1988 <br />December 12, 1977 <br />October 11, 1977 <br /> <br />April 14, 1976 <br />August 16, 1976 <br /> <br />The initial Consultation Coordination Officer (CeO) meetings were held with <br />representatives from the communities, the study contractors, and FEMA, to <br />explain the nature and purpose of FISs, and to identify the streams to be studied <br />by detailed methods. All affected communities were requested to provide any <br />data pertinent to the study. The final CCO meetings were held with <br />representatives from the communities, the study contractors, and FEMA to <br />review the results of the studies. <br /> <br />For this countywide FIS, an initial ceo meeting was held on June 28, 1989, <br />with representatives the CWCB, FEMA, and the study contractor. The <br />final ceo meeting was held on November 2, 2005 to review the results of this <br />countywide FIS. <br /> <br />2.0 AREA STUDIED <br /> <br />2.1 Scope of Study <br /> <br />This FIS report covers the geographic area of Clear Creek County, Colorado, <br />including the incorporated communities listed in Section 1.1. The areas studied <br />by detailed methods were selected with priority given to all known flood hazards <br />and areas of proj ected development or proposed construction. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.