My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00272
CWCB
>
Weather Modification
>
Backfile
>
WMOD00272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:29:16 PM
Creation date
5/16/2007 3:02:42 PM
Metadata
Fields
Template:
Weather Modification
Title
The Feasibility of Operational Cloud Seeding in the North Platte River Basin Headwaters to Increase Mountain Snowfall
Prepared For
US Department of the Interior Bureau of Reclaimation
Prepared By
Jonnie G. Medina, Technical Service Center, Water Resources Services
Date
5/1/2000
County
Statewide
State
CO
Weather Modification - Doc Type
Scientific Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> TABLE 3.2. ~ PROJECT DESIGN AND EQUIPMENT COSTS <br /> STAFF COSTS TRAVEL COSTS EQUIPMENT AND CONTRACT COSTS <br /> SD Number Cost Equip & <br /> Time Staff Daily Total TDY Total of items per Other Contract <br />PROJECT TASK Required Days rate Staff Costs Travel Travel item costs Total Total Task <br /> Calendar <br /> Days Costs Days Rate Misc. <br />DESIGN OF PROGRAM <br />Detailed Terrain Study 30 15 712 10680 10,680 <br />Terrain Mapping/GIS Study 15 600 9000 9,000 <br />Modeling Weather and Clouds and Seeding <br />Targeting (Three Seasons) 120 20 712 14240 15 50 750 150,000 164,990 <br />Equipment Siting and Logistical Studies 15 15 712 10680 5 50 250 10,930 <br /> suppport staff 10 600 6000 6,000 <br />Survey of Possible Locations for Generators 30 20 712 14240 20 120 300 2700 15,000 31,940 <br /> suppport staff 20 600 12000 20 120 2400 14,400 <br />Selection of Seeding Sites and Obtaining Approvals <br />from USFS and Land Owners, Survey by Helicopter <br />( 7 days @$500/h) 120 50 712 35600 10 120 500 1700 56 250 15000 29000 66,300 <br />Design Phase Field Studies; Seeding Design <br />Development and Testing (two seasons); Final <br />Seeding Design Development 160 100 712 71200 60 120 1000 8200 700000 779,400 <br />Subtotal of Cloud Seeding Program Design 475 265 183640 16000 894000 1,093,640 <br />Development of Evaluation Plan for Seeding Effects <br />(Design Phase/Operational Phase); Evaluation of <br />Design Phase Seeding 60 30 712 21360 40000 61,360 <br />Subtotal of Design Development and Design <br />Phase Seeding Evaluation 535 560 6784 205000 16000 934000 1,155,000 <br />Environmental Assessment and Impact Studies and <br />Final Permitting 365 200 712 142400 5 120 600 150000 293,000 <br />Specifications Development for Seeding Generators 20 15 712 10680 10,680 <br />Specifications Development for Seeding Generator <br />Local Siting and Maintenance 20 15 712 10680. 10,680 <br />Specifications Development for Seeding Materials <br />and Operational Maintenance of Seeding Solutions, <br />Propane, Delivery Systems, and Related 10 15 712 10680 10,680 <br />USSR Contracting Office 180 30 600 18000 18,000 <br />Subtotal of Environmental and Equipment <br />Specification 230 75 2736 192440 343,040 <br />Design and Environmental Costs 1,498,040 <br /> <br />ll, <br />
The URL can be used to link to this page
Your browser does not support the video tag.