My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Southwest - Goodman Point Pipeline Environmental Assessment_Final Env & Eng Report
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Southwest - Goodman Point Pipeline Environmental Assessment_Final Env & Eng Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2012 12:23:15 PM
Creation date
5/16/2007 8:51:26 AM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
Southwest
Applicant
Goodman Point Water Association
Description
Goodman Point Water Association Environmental Report - Preliminary Engineering Report
Account Source
Basin
Board Meeting Date
3/13/2007
Contract/PO #
08000000075
WSRF - Doc Type
Final Deliverable Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C Annual Operating Budget <br /> <br />1. Income <br />Once constmcted, Goodman Point will be located in an area designated as outlying area <br />by MWC. The existing water rate schedule for outlying areas from Montezuma Water <br />Company is shown below. <br /> <br />Table VII-4: MWC Monthly Rates for Outlying Areas <br /> <br />Meter Size <br />5/8" x %" <br /> <br />1 " <br /> <br />Monthly Base Rate Charge <br />$18.50 <br />$40.00 <br />$60.00 <br />$135.00 <br />$210.00 <br />$385.00 <br /> <br />%" <br /> <br />1-1/2" <br /> <br />12" <br />3" <br /> <br />The usage rate per 1 000 gallons of water is $3.15 regardless of meter size. <br /> <br />A base rate charged to each tap subscriber is developed to cover costs associated with <br />operation and maintenance, insurance, loan repayment, cash reserve, and replacement of <br />terminal assets. A breakdown of each of these costs is described in detail below. <br /> <br />2. Operation and Maintenance Costs <br /> <br />Operation and maintenance costs include the power costs associated with operating the <br />system and maintenance costs. Power costs in the area are $0.0919 per kilowatt hour. <br />Estimated annual power costs are $5,400 to operate one pump 24-hours a day. The VFD <br />on the booster pumps require approximately 2 times the power that a standard 5 hp pump <br />would require. This is reflected in the estimated annual power costs. This is a <br />conservative estimate and actual pump operating costs will be less. <br /> <br />Maintenance costs include regular maintenance on the tank and pumps and distribution <br />system repairs. Labor costs include those for reading meters, collecting samples, regular <br />operation of valves and hydrants, and emergency response. Total maintenance costs are <br />estimated at $18,500 annually and were estimated by the Montezuma Water Company. <br />MWC will be solely responsible for the operation and maintenance of the distribution <br />system, pump station, and tanks once constmcted. <br /> <br />The total annual operation and maintenances costs are thereby estimated at approximately <br />$23,900 per year. These costs will be recouped by MWC through customer rate charges. <br />Insurance costs are estimated at $3,000 annually, which will be divided up equally among <br />customers and included in assessed customer rate charges. <br /> <br />3. Debt Repayments <br />The proposed project will be financed through a combination of USDA Rural Utilities <br />Service grants and loans. It is anticipated that 75% of the project will be funded through <br /> <br />Goodman Point Water Association - Preliminaty Engineering RepOli <br /> <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.