My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10351
CWCB
>
Floodplain Documents
>
Backfile
>
10001-11000
>
FLOOD10351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 10:24:26 AM
Creation date
5/15/2007 10:42:04 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Statewide
Title
Statewide River Rehabilitation & Flood Plain Management Needs Inventory
Date
12/1/1998
Prepared For
State of Colorado Department of Natural Resources
Prepared By
McLaughlin Water Engineers
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />fund loan program to enable communities to address flood mitigation, stream rehabilitation, and <br />watershed improvements. <br /> <br />Public Informationrrechnical Assistance. Respondents identified nearly 500 miles of unmapped, 1 DO-year <br />floodplain. Statewide, CWCB staff and MWE project staff estimate there are at least 1500 miles needing to <br />be studied and mapped. In addition, floodplain mapping completed nearly 20 years ago needs to be <br />updated. The community surveys also identified the need to (1) establish a program of information <br />sharing to disseminate information relating to flood hazards, flood mitigation techniques, and stream <br />corridor values, and (2) provide technical data, training, and education to local decision makers who deal <br />directly with watershed, stream corridor, and floodplain management. <br /> <br />Policv and Criteria. Policies should be established concerning: (1) creating a storm water detention policy <br />to control excess runoff from new development limiting the increase of peak flows in the floodplain, (2) <br />establishing a statewide wetlands banking process to allow reallocation of existing and new wetlands <br />resulting from multi-objective stream corridor management. New criteria should be established: <br />(1) defining baseline conditions (100 year event) for stream corridor management activities, (2) defining a <br />higher level of protection (500 year event) than baseline conditions for critical facilities, and (3) creating <br />and adopting a statewide model storm water criteria manual. <br /> <br />At meeting number five on March 12, 1998, the Committee acted on the following final products for the <br />project. The discussion topics were: <br /> <br />· Prepare a project informational brochure and select an appropriate title <br />· Discuss the final recommendations for the project needs categories <br />· Review and discuss on the consultant's draft final project report <br /> <br />The Steering Committee, CWCB, and consultant decisions on March 12th were: <br /> <br />Project Infonnatlonal Brochure. The brochure should be entitled "Stream Rehabilitation and Flood <br />Protection Needs in Colorado." The brochure content should include: "What's the Need?" (survey <br />findings), Requested Funding Mechanisms, Values of Stream Corridors, Goals for Streams Corridors, "How <br />Do We Get There?", and Benefits. <br /> <br />Final Recommended Project Need Categories. The Committee agreed on the final need categories that are: <br />· Planning Assistance - River Basin Multi-Objective Plans and Floodplain Mapping <br />· Funding Implementation - Revolving Loan Fund and Flood Emergency Account <br />· Public Information/ Technical Assistance - Floodplain Hazard Awareness and GIS <br />· Policy and Criteria - Establish Minimum Standards <br /> <br />Review and Discussion on the Draft Final Project Report. The Committee members were requested to <br />provide comments on the contents of the draft report by March 19, 1998. <br /> <br />Section IV - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.