Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />CHAPTER IV <br />"ASSESSMENT RESULTS <br />'" '. <br /> <br />OVERVIEW <br /> <br />By the initial November 14, 1997 questionnaire return deadline, the project had received a ten percent <br />response to the questionnaire. The consultant input the responses and other information into a database <br />system as described in Chapter V. The initial query from the database system yielded a set of general <br />categories. These categories were presented to the Steering Committee at its December 10, 1997 meet- <br />ing. The discussion items for the general categories and issues are presented the following outline: <br /> <br />OUTLINE FOR DISCUSSION ITEMS <br /> <br />INFORMATION <br />· Floodplain Mapping <br /> <br />PLANNING <br />· Multi-Objective Planning and Projects <br />· Watershed Master Planning <br /> <br />IMPLEMENTATION <br />· Funding Mechanisms for Floodplain Projects <br /> <br />REGULATORY <br />· Stormwater Detention Policy <br />· Statewide Design Standard and Criteria <br />Manuals <br />· Wetland Detention Policy <br /> <br />General Categories <br />Roodplaln Mapping <br />· What still needs to be mapped? <br />· How much will it cost? <br />· Who will we partner with to complete the <br />mapping? <br />· Accurate information is needed <br />· What are our priorities in mapping? <br />r:J 1 DO-year flOOdplain? <br />· Which floodplain do we map, and how <br />detailed should it be? <br />r:J Present conditions, or future <br />development <br /> <br />Section IV - 1 <br /> <br />r:J <br /> <br />Geomorphic (may alleviate problem <br />of present or future) <br /> <br />Stormwater Detention Policy <br />· Regional detention <br />· Managed releases to prevent surges <br />downstream <br />What are the water rights issues? <br /> <br />Streambank Stabilization <br />· Create a yearly, regional 404 permit <br />· Standard designs <br />· Why not undertake vegetative measures to <br />prevent erosion? <br />· Determine causes before fixing <br />· River and stream classifications should be <br />standardized <br />· "Show me" the federal interest to obtain <br />funding and permits <br /> <br />Multl-ObJecUve Projects and Planning <br />· Should be value based - based on a <br />consensus of the importance of all issues <br />· Should include multi-use <br />· It is a process <br />· Statewide plan of needs for legislative <br />funding <br />