My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Divsion 3 Diversion Structure Inventory Conejos River
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
Divsion 3 Diversion Structure Inventory Conejos River
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:20:24 AM
Creation date
5/14/2007 12:03:08 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C154045
Contractor Name
Olsson Associates
Contract Type
Grant
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I f~ l"~~,~ OLSSO N <br /> <br />ASSOCIATES <br />143 Union Blvd. Suite 700 Lakewood, CO 80228 720-962-6072 <br /> <br /> <br />CON_EJ.OS RIVER_ <br />DIV.E,RS.IO,N STRUC:TURE, IN,VE'NTORY <br /> <br />Structure Name: Sabine School Section Ditch <br /> <br />Reported By: Jason Mead <br /> <br />Date: <br /> <br />5/15/06 <br /> <br />Time: <br /> <br />10:00 a.m. <br /> <br />Directions: <br /> <br />North out of Antonito on Hwy 285, approx. 1.25 mile north of intersection of Hwy <br />285 & County Rd. G6, then east onto access road just past North Branch Bridge, <br />follow the north branch approx. 1 ,000 ft on foot and then head south to south <br />branch <br />Latitude <br />N37006'07.8" <br /> <br />Longitude <br />W106000'07.9" <br /> <br />Section <br />NE1/4 S17 <br /> <br />Township <br />T33N <br /> <br />Range <br />R9E <br /> <br />Location: <br /> <br />Type: <br /> <br />Manually operated 3.5' to 4' wide steel slide gate <br /> <br />Cond ition: <br /> <br />Good <br />Fair <br />Poor <br /> <br />D <br />IZI Submerged: <br />D <br /> <br />No D <br />Yes IZI <br /> <br />Reason Submerged: <br />High River Flow <br /> <br />Repair(s) Needed: None <br /> <br />Upstream Configuration: There is a diversion dam constructed of recycled molasses tanks <br />downstream that directs water to the headgate, which sits along the north bank of the south branch of <br />the Conejos River. <br /> <br />Comments: The Sabine School Section Ditch is a priority 39 and splits downstream to two separate <br />owners, each ditch with its own Parshall flume. The Conejos Water Conservancy District recently <br />carried out bank rehabilitation measures just upstream of the structure. <br /> <br />Estimated Range of Cost: N/A <br /> <br />F:\Projects\20060507\Documents\Reports\Conejos\lnventory Forms\Sabine School Section Ditch.doc <br /> <br />OA No. 2-2006-0507 <br />
The URL can be used to link to this page
Your browser does not support the video tag.