My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Divsion 3 Diversion Structure Inventory Alamosa River
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
Divsion 3 Diversion Structure Inventory Alamosa River
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:20:24 AM
Creation date
5/14/2007 11:15:19 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C154045
Contractor Name
Olsson Associates
Contract Type
Grant
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I f~ l"~~,~ OLSSO N <br /> <br />ASSOCIATES <br />143 Union Blvd. Suite 700 Lakewood, CO 80228 720-962-6072 <br /> <br /> <br />AL.AM~O.S~A RJVER <br />DIV'E,RSIO,N STRU.CTU.RE INVENTO,RY' <br /> <br />Structure Name: Romaldo Valdez Ditch <br /> <br />Reported By: Jason Mead <br /> <br />Date: <br /> <br />5/17/06 <br /> <br />Time: <br /> <br />11 :30 a.m. <br /> <br />Directions: <br /> <br />From Capulin, head west on State Route 15, go approximately 3/4 of a mile and <br />turn north on to an access road and follow it north to the headgate. The <br />Romaldo Valdez Ditch headgate is east of the Miller Ditch headgate. <br /> <br />Location: <br /> <br />Latitude <br />N37017'18.4" <br /> <br />Longitude <br />W106007'34.6" <br /> <br />Section <br />SW1/4 S8 <br /> <br />Township <br />T35N <br /> <br />Range <br />R8E <br /> <br />Type: <br /> <br />Manually operated 3' wide wood slide gate <br /> <br />Cond ition: <br /> <br />Good <br />Fair <br />Poor <br /> <br />D <br />IZI Submerged: <br />D <br /> <br />No D <br />Yes IZI <br /> <br />Reason Submerged: <br />High River Flow <br /> <br />Repair(s) Needed: None <br /> <br />Upstream Configuration: There is a small rock diversion dam that diverts flow along the river to the <br />headgate, which sits along the south bank of the river. <br /> <br />Comments: The downstream flow measurement device is a 1.5' wide Parshall flume. <br /> <br />Estimated Range of Cost: N/A <br /> <br />F:\Projects\20060507\Documents\Reports\Alamosa\lnventory Forms\Romaldo Valdez Ditch.doc <br /> <br />OA No. 2-2006-0507 <br />
The URL can be used to link to this page
Your browser does not support the video tag.