Laserfiche WebLink
<br />O"~OLssON <br /> <br /> <br />ASSOCIATES <br />143 Union Blvd. Suite 700 Lakewood, CO 80228 720-962-6072 <br /> <br />RI,Q.l GRA,NDE RIVER <br />D.I~V'ERSlO.N" ST'RU,C:T'U.R_E I~N_VEN~T'O.RY' <br /> <br />Structure Name: Independent Ditch #1 <br /> <br />Reported By: Dave Skuodas <br /> <br />Date: <br /> <br />5/11 106 <br /> <br />Time: <br /> <br />6:00 p.m. <br /> <br />Directions: <br /> <br />From Alamosa, head north out of town on North River Road, turn west on <br />County Road 4.5 South, turn north on South County Road 108 South, turn west <br />on County Road 4 South, go approximately 3/4 of a mile and turn south on to an <br />access road and follow it south down to the Rio Grande River. <br />Latitude Longitude Section Township <br />N37 <>30'36.6" W1 05054'33.4" NW 114 S29 T38N <br /> <br />Range <br />R10E <br /> <br />Location: <br /> <br />Type: Manually operated 3' wide steel slide gates <br /> <br />Good [gI No D Reason Submerged: <br />Condition: Fair D Submerged: Yes [gI High River Flow <br />Poor D <br />Repair(s) Needed: None <br /> <br />Upstream Configuration: There is a large concrete diversion dam consisting of a pair of radial <br />gates and a concrete weir that diverts river flow to the headgate. The headgate sits along a short <br />feeder channel that comes off of the river just upstream of the diversion dam. There is a steel trash <br />rack just upstream of the headgate. <br /> <br />Comments: The downstream flow measure device is a rated box, and according to the water <br />commissioner it does not work properly. The diversion dam and headgate are brand new, and they <br />are owned by the City of Alamosa. <br /> <br />Estimated Range of Cost: N/A <br /> <br />F:\Projects\20060507\Documents\Reports\Rio Grande\lnventory Forms\lndependent Ditch #1.doc <br /> <br />OA No. 2-2006-0507 <br />