Laserfiche WebLink
<br />O"~OLssON <br /> <br /> <br />ASSOCIATES <br />143 Union Blvd. Suite 700 Lakewood, CO 80228 720-962-6072 <br /> <br />RI,Q.l GRA,NDE RIVER <br />D.I~V'ERSlO.N" ST'RU,C:T'U.R_E I~N_VEN~T'O.RY' <br /> <br />Structure Name: Chicago Ditch <br /> <br />Reported By: Dave Skuodas <br /> <br />Date: <br /> <br />5/11 106 <br /> <br />Time: <br /> <br />6:30 p.m. <br /> <br />Directions: <br /> <br />From Alamosa, head east on U.S. 160, turn south on Adams Lane, cross over <br />the railroad tracks and head south on Emperitus Road. Cross over the ditch and <br />follow it west to the headgate at the river. <br /> <br />Location: <br /> <br />Latitude <br />N37 <>27'39.5" <br /> <br />Longitude <br />W1 05050'24.6" <br /> <br />Section <br />SE1/4S11 <br /> <br />Township <br />T37N <br /> <br />Range <br />R10E <br /> <br />Type: Mechanically operated 10' wide radial gate <br /> <br />Good [gI No D Reason Submerged: <br />Condition: Fair D Submerged: Yes [gI High River Flow <br />Poor D <br />Repair(s) Needed: None <br /> <br />Upstream Configuration: There is a trapezoidal concrete diversion dam with a radial adjustment <br />gate that diverts water to the headgate, which is located along the eastern bank of the river. <br /> <br />Comments: The structure looked to be fairly new construction, and the water commissioner said <br />that the construction costs were approximately $1.2 million. <br /> <br />Estimated Range of Cost: NIA <br /> <br />F:\Projects\20060507\Documents\Reports\Rio Grande\lnventory Forms\Chicago Ditch.doc <br /> <br />OA No. 2-2006-0507 <br />