My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Division 3 Diversion Inventory Rio Grande River - Part 5
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
Division 3 Diversion Inventory Rio Grande River - Part 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:20:24 AM
Creation date
5/10/2007 3:48:43 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C154045
Contractor Name
Olsson Associates
Contract Type
Grant
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />O"~OLssON <br /> <br /> <br />ASSOCIATES <br />143 Union Blvd. Suite 700 Lakewood, CO 80228 720-962-6072 <br /> <br />RI,Q.l GRA,NDE RIVER <br />D.I~V'ERSlO.N" ST'RU,C:T'U.R_E I~N_VEN~T'O.RY' <br /> <br />Structure Name: Consolidated Slough <br /> <br />Reported By: Dave Skuodas <br /> <br />Date: <br /> <br />5/11 106 <br /> <br />Time: <br /> <br />12:15 p.m. <br /> <br />Directions: <br /> <br />From Monte Vista, head west on U.S. 160, turn north on Stoeber Lane and go <br />approximately 2.75 miles to an access road that is just south of the bridge over <br />the Rio Grande River. Head west along the Consolidated Slough to the <br />headgate. <br />Latitude <br />N37 <>37'46.7" <br /> <br />Longitude <br />W1 06013'16.8" <br /> <br />Section <br />NW1/4S16 <br /> <br />Township <br />T39N <br /> <br />Range <br />R7E <br /> <br />Location: <br /> <br />Type: <br /> <br />Mechanically operated 6' wide steel slide gates (6) <br /> <br />Good D No D Reason Submerged: <br />Condition: Fair [gI Submerged: Yes [gI High River Flow <br />Poor D <br />Repair(s) Needed: There is some spalling concrete that could be patched <br /> <br />Upstream Configuration: There is a formidable concrete and corrugated steel diversion dam <br />downstream that directs water to the headgate, which sits along the south bank of the Rio Grande <br />River. There is a log trash boom along the front of the headgate. <br /> <br />Comments: The ditch riders were onsite at the time of the site visit, making adjustments to the <br />headgate levels. The structure is in overall fair condition, but could use some patching in areas <br />where there is spalling concrete. <br /> <br />Estimated Range of Cost: Low <br /> <br />F:\Projects\20060507\Documents\Reports\Rio Grande\lnventory Forms\Consolidated Slough.doc <br /> <br />OA No. 2-2006-0507 <br />
The URL can be used to link to this page
Your browser does not support the video tag.