My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Division 3 Diversion Inventory Rio Grande River - Part 5
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
Division 3 Diversion Inventory Rio Grande River - Part 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:20:24 AM
Creation date
5/10/2007 3:48:43 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C154045
Contractor Name
Olsson Associates
Contract Type
Grant
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />O"~OLssON <br /> <br /> <br />ASSOCIATES <br />143 Union Blvd. Suite 700 Lakewood, CO 80228 720-962-6072 <br /> <br />RI,Q.l GRA,NDE RIVER <br />D.I~V'ERSlO.N" ST'RU,C:T'U.R_E I~N_VEN~T'O.RY' <br /> <br />Structure Name: Empire Canal <br /> <br />Reported By: Dave Skuodas <br /> <br />Date: <br /> <br />5/11 106 <br /> <br />Time: <br /> <br />3:00 p.m. <br /> <br />Directions: <br /> <br />From Monte Vista, head east on U.S. 160, turn north on North County Road 1 <br />East (Henderson Road), head north approximately 1.75 miles through a farm <br />and down to the river. <br /> <br />Location: <br /> <br />Latitude <br />N37 <>36'06.2" <br /> <br />Longitude <br />W1 06007'48.3" <br /> <br />Section <br />NW 1/4 S29 <br /> <br />Township <br />T39N <br /> <br />Range <br />R8E <br /> <br />Type: <br /> <br />Mechanically operated radial gates (2) <br /> <br />Good [gI No D Reason Submerged: <br />Condition: Fair D Submerged: Yes [gI High River Flow <br />Poor D <br />Repair(s) Needed: There is some spalling concrete that could be patched. <br /> <br />Upstream Configuration: The headgate sits along the south bank of the river. There is a fence <br />trash rack along the south bank of the river just upstream of the headgate. There are slots in the <br />headgate upstream of the radial gates to place stop boards. <br /> <br />Comments: There is a downstream adjustment structure that was also visited, and it is located at <br />latitude N37 <>34'54.5", longitude W1 06006'22.5" The adjustment structure consists of mechanically <br />operated radial gates and a concrete diversion dam and radial adjustment gate. The adjustment <br />structure is in good condition, and does not need any repairs. <br /> <br />Estimated Range of Cost: Low <br /> <br />F:\Projects\20060507\Documents\Reports\Rio Grande\lnventory Forms\Empire Canal.doc <br /> <br />OA No. 2-2006-0507 <br />
The URL can be used to link to this page
Your browser does not support the video tag.