My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Division 3 Diversion Inventory Rio Grande River - Part 5
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
Division 3 Diversion Inventory Rio Grande River - Part 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:20:24 AM
Creation date
5/10/2007 3:48:43 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C154045
Contractor Name
Olsson Associates
Contract Type
Grant
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />O"~OLssON <br /> <br /> <br />ASSOCIATES <br />143 Union Blvd. Suite 700 Lakewood, CO 80228 720-962-6072 <br /> <br />RI,Q.l GRA,NDE RIVER <br />D.I~V'ERSlO.N" ST'RU,C:T'U.R_E I~N_VEN~T'O.RY' <br /> <br />Structure Name: <br /> <br />Billings Ditch <br /> <br />Reported By: <br /> <br />Dave Skuodas <br /> <br />Date: <br /> <br />5/11/06 Time: 3:00 p.m. <br /> <br />From Monte Vista, head north on U.S. 285, turn east on North Farm Road, go <br />approximately 2 miles to North County Road 2 East, head south on North County <br />Road 2 East and keep heading south down through a farm and to the headgate <br />along the Rio Grande River. <br />Latitude Longitude Section <br />N37<>35'59.6" W106006'45.7" NE 1/4 S29 <br /> <br />Township <br />T39N <br /> <br />Range <br />R8E <br /> <br />Directions: <br /> <br />Location: <br /> <br />Type: Manually operated 3' wide steel slide gate <br /> <br />Good [gI No D Reason Submerged: <br />Condition: Fair D Submerged: Yes [gI High River Flow <br />Poor D <br />Repair(s) Needed: None <br /> <br />Upstream Configuration: A short feeder ditch comes off of the river and directs river flow to the <br />headgate. There is a diversion dam along the river that directs river flow to the feeder ditch, and <br />there is a log trash boom at the entrance of the feeder ditch. <br /> <br />Comments: Structure has a welded steel plate headwall. <br /> <br />Estimated Range of Cost: N/A <br /> <br />F:\Projects\20060507\Documents\Reports\Rio Grande\lnventory Forms\Billings Ditch.doc <br /> <br />OA No. 2-2006-0507 <br />
The URL can be used to link to this page
Your browser does not support the video tag.