My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Division 3 Diversion Inventory Rio Grande River - Part 3
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
Division 3 Diversion Inventory Rio Grande River - Part 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:20:24 AM
Creation date
5/10/2007 3:11:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C154045
Contractor Name
Olsson Associates
Contract Type
Grant
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />... :~I" 1\. <br /> <br />I~) r\...OLssON <br /> <br />ASSOCIATES <br />143 Union Blvd, Suite 700 Lakewood, CO 80228 720-962-6072 <br /> <br /> <br />R_I.O: GRA.N_D.E, RIVER. <br />DIVERS.ION S.TRUG:TURE, IN,VE'NTORY <br /> <br />Structure Name: Silva Ditch <br /> <br />Reported By: Jason Mead <br /> <br />Date: <br /> <br />5/10/06 <br /> <br />Time: <br /> <br />8:30 a.m. <br /> <br />Directions: <br /> <br />East from Del Norte on Hwy 160 to West County Rd. 5N (Five Mile Rd), then <br />east on West County Rd. 5N approximately 1.25 miles to access road just past <br />Valdeses Cemetery, north on access road to headgate. <br /> <br />Location: <br /> <br />Latitude <br />N37039'04.9" <br /> <br />Longitude <br />W106015'15.3" <br /> <br />Section <br />SW1/4 S6 <br /> <br />Township <br />T39N <br /> <br />Range <br />R7E <br /> <br />Type: <br /> <br />Manually operated 3' wide steel slide gate <br /> <br />Cond ition: <br /> <br />Good <br />Fair <br />Poor <br /> <br />[gI <br />D Submerged: <br />D <br /> <br />No D <br />Yes [gI <br /> <br />Reason Submerged: <br />High River Flow <br /> <br />Repair(s) Needed: None <br /> <br />Upstream Configuration: There is a boulder diversion dam that directs water to the headgate, <br />which is located down a short feeder channel off the south bank of the Rio Grande River. <br /> <br />Comments: The Atencio Ditch #2 headgate is located on the same feeder channel, just to the <br />southwest of the Silva Ditch headgate. <br /> <br />Estimated Range of Cost: N/A <br /> <br />F:\Projects\20060507\Documents\Reports\Rio Grande\lnventory Forms\Silva Ditch.doc <br /> <br />OA No. 2-2006-0507 <br />
The URL can be used to link to this page
Your browser does not support the video tag.