My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Division 3 Diversion Inventory Rio Grande River - Part 3
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
Division 3 Diversion Inventory Rio Grande River - Part 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:20:24 AM
Creation date
5/10/2007 3:11:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C154045
Contractor Name
Olsson Associates
Contract Type
Grant
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />... :~I,. 1\. <br /> <br />I~) r\...OLssON <br /> <br />ASSOCIATES <br />143 Union Blvd. Suite 700 Lakewood, CO 80228 720-962-6072 <br /> <br /> <br />R.I. 0: GRA.N.O,E, RIVER. <br />DIVERS,ION S,TRUC:TURE, IN,VE'NTORY <br /> <br />Structure Name: Brey Ditch <br /> <br />Reported By: Jason Mead <br /> <br />Date: <br /> <br />5/10/06 <br /> <br />Time: <br /> <br />12:15pm <br /> <br />Directions: <br /> <br />From Del Norte, north on State Rd. 112, then east on State Rd. 374 (Seven Mile <br />Rd.) approx. 0.7 miles, south on access road past Kane & Callan Ditch over <br />bridge to south side of Rio Grande River. Follow the river west approx. 0.5 miles <br />to headgate. <br />Latitude <br />N37041 '12.1" <br /> <br />Longitude <br />W106020'19.8" <br /> <br />Section <br />NE1/4 S29 <br /> <br />Township <br />T40N <br /> <br />Range <br />R6E <br /> <br />Location: <br /> <br />Type: <br /> <br />Manually operated steel slide gate <br /> <br />Good D No D Reason Submerged: <br />Condition: Fair D Submerged: IV! High River Flow <br />Poor ~ Yes LC:,J <br /> <br />Repair(s) Needed: Headgate is inoperable due to debris and possible gate failure. The dry stacked <br />rock headwall is being eroded along the edges. Downstream flow measurement device is outdated. <br />Structure does not have an operable diversion dam. <br /> <br />Upstream Configuration: A short feeder ditch comes off of the river and directs flow to the <br />headgate, which sits on the south bank of the Rio Grande River. <br /> <br />Comments: There is a downstream flow measurement device that consists of a weir and corrugated <br />steel sheetpile divider. There used to be a log spanning the main channel that was used as a <br />channel diversion to direct water into the feeder channel. According to the water commissioner, the <br />owner would like to transfer the water rights for this ditch to the Weiss Ditch. The Brey Ditch has <br />more senior water rights. <br /> <br />Estimated Range of Cost: Medium <br /> <br />F:\Projects\20060507\Documents\Reports\Rio Grande\lnventory Forms\Brey Ditch.doc <br /> <br />OA No. 2-2006-0507 <br />
The URL can be used to link to this page
Your browser does not support the video tag.