My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Division 3 Diversion Inventory Rio Grande River - Part 2
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
Division 3 Diversion Inventory Rio Grande River - Part 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:20:24 AM
Creation date
5/10/2007 1:31:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C154045
Contractor Name
Olsson Associates
Contract Type
Grant
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />O"~OLssON <br /> <br /> <br />ASSOCIATES <br />143 Union Blvd. Suite 700 Lakewood, CO 80228 720-962-6072 <br /> <br />RI,Q.l GRA,NDE RIVER <br />D.I~V'ERSlO.N" ST'RU,C:T'U.R_E I~N_VEN~T'O.RY' <br /> <br />Structure Name: Riviere Estates Augmentation Plan <br /> <br />Reported By: Dave Skuodas <br /> <br />Date: <br /> <br />5/1 0/06 <br /> <br />Time: <br /> <br />12 p.m. <br /> <br />Directions: <br /> <br />Take U.S. 160 to the Riviere RV Park, which is behind the Lazy Bear Cabins on <br />the east side of South Fork <br /> <br />Location: <br /> <br />Latitude <br />N37040'34.5" <br /> <br />Longitude <br />W1 06 <>37'14" <br /> <br />Section <br />NW 1/4 S35 <br /> <br />Township <br />T40N <br /> <br />Range <br />R3E <br /> <br />Type: <br /> <br />Manually operated steel slide gate <br /> <br />Good D <br />Condition: Fair [gI Submerged: <br />Poor D <br />Repair(s) Needed: None <br /> <br />No [gI <br />Yes D <br /> <br />Reason Submerged: <br />See photo log <br /> <br />Upstream Configuration: A short feeder ditch directs water from the river to the headgate. There <br />are log trash booms across the feeder ditch to prevent debris buildup in front of the headgate. <br /> <br />Comments: Structure feeds a couple of ponds in the RV park. <br /> <br />Estimated Range of Cost: NIA <br /> <br />F:\Projects\20060507\Documents\Reports\Rio Grande\lnventory Forms\Riviere Estates Aug Plan Ditch.doc <br /> <br />OA No. 2-2006-0507 <br />
The URL can be used to link to this page
Your browser does not support the video tag.