My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Divsion 3 Diversion Structure Inventory San Antonio River
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
Divsion 3 Diversion Structure Inventory San Antonio River
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:20:24 AM
Creation date
5/7/2007 4:35:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C154045
Contractor Name
Olsson Associates
Contract Type
Grant
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I f~ l"~~,~ OLSSO N <br /> <br />ASSOCIATES <br />143 Union Blvd. Suite 700 Lakewood, CO 80228 720-962-6072 <br /> <br /> <br />S. -A~' N' A: N r-Q/ .: N I O"'.J R.I V." E- R- , <br /> <br />,~ - ~ . ~ - - - - ".~ ~" .-' - - - - ,.- <br /> <br /> <br />DIV'E,RSIO.N STRU.CTU.RE INVENTO.RY' <br /> <br />Structure Name: Braiden Overflow Ditch #1 <br /> <br />Reported By: Dave 8kuodas <br /> <br />Date: <br /> <br />5/16/06 <br /> <br />Time: <br /> <br />10:00 a.m. <br /> <br />Directions: <br /> <br />From Antonito, head south on County Road 14, go approximately 1 mile and turn <br />east on County Road E5, go approximately 4 miles and turn north on County <br />Road 18, go approximately 1.5 miles and turn west on County Road G. The <br />headgate is on the north side of the road on the east side of the river where it <br />crosses County Road G. <br />Latitude Longitude <br />N37004'46.3" W105055'46.6" <br /> <br />Section <br />8E1/4824 <br /> <br />Township <br />T33N <br /> <br />Range <br />R9E <br /> <br />Location: <br /> <br />Type: <br /> <br />Manually operated 6' wide steel slide gate <br /> <br />Good D No D Reason Submerged: <br />Condition: Fair ~ Submerged: IV! High River Flow <br />Poor D Yes LC:,J <br /> <br />Repair(s) Needed: The structure is in fair condition, but there is excessive debris along the <br />diversion dam that needs to be removed. <br /> <br />Upstream Configuration: A short feeder ditch comes off of the river and directs water to the <br />headgate. There is a diversion dam spanning the river that diverts water to the feeder ditch. <br /> <br />Comments: The structure 10# is 515 <br /> <br />Estimated Range of Cost: Low <br /> <br />F:\Projects\20060507\Documents\Reports\San Antonio\lnventory Forms\Braiden Overflow Ditch #1.doc <br /> <br />OA No. 2-2006-0507 <br />
The URL can be used to link to this page
Your browser does not support the video tag.