My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00066 (4)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00066 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:44:03 PM
Creation date
5/4/2007 1:41:51 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/12/2007
Description
ISF Section - Statement of Opposition - Case No. 5-06CW269 - Application of SM Coles, LLC
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Consent Agenda Item l.h <br />Case No. 5-06CW269: Application of SM Coles, LLC <br /> <br />Application Summary <br /> <br />This is an application for augmentation and change of water rights near Snowmass. Applicant seeks <br />the following: <br />1. Approval of a plan for augmentation to replace out-of-priority depletions resulting from <br />stock watering and evaporation from Ponds A through G (more fully described in Case No. <br />06CW268). Sources of augmentation include Ponds A-G, historic consumptive use credits <br />associated with the dry up ofa portion of the land historically irrigated with the Walter <br />Ditch water rights, and water obtained from the Basalt Water Conservancy District (Ruedi <br />and Green Mountain Reservoirs). <br />2. Change of use of the Walter Ditch water rights to include augmentation and storage. <br /> <br />CWCB Appropriations <br /> <br />CWCB StreamlLake Amount Approp. Watershed County <br />Case No. (cfs) Date <br />5-76W2943A Snowmass Creek 12/(9-12) 1/14/76 Roaring Fork River Pitkin <br />5-92CW280 Snowmass Creek 3 (enl) 9/15/92 Roaring Fork River Pitkin <br />5-76W2943B Snowmass Creek 12/11 1/14/76 Roaring Fork River Pitkin <br />5-92CW281 Snowmass Creek 10.5 (en I) 9/15/92 Roaring Fork River Pitkin <br />5-85CW646 Roaring Fork River 55/30 11/8/85 Roaring Fork River Pitkin <br />5-85CW639 Roaring Fork River 145/75 11/8/85 Roaring Fork River Pitkin <br /> <br />Potential for Iniurv <br /> <br />The Applicant's proposed change of water rights may result in an expansion of use that could injure <br />the Board's instream flow water rights on Snowmass Creek and the Roaring Fork River. The <br />Applicant's proposed plan for augmentation may injure the Board's instream flow water rights on <br />Snowmass Creek and the Roaring Fork River by not replacing out-of-priority depletions in time, <br />place and amount. <br /> <br />Other Obiectors <br />No other statements of opposition to this application were filed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.