My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Upper Arkansas River Divsion 2 Diversion Structure Inventory.pd
CWCB
>
Loan Projects
>
Backfile
>
3001-3102
>
Upper Arkansas River Divsion 2 Diversion Structure Inventory.pd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2010 3:10:14 PM
Creation date
5/4/2007 11:03:13 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C154021
Contractor Name
Olsson Associates
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />0\ <br /> <br /> <br />OLSSON ASSOCIATES <br /> <br />: ,,(. I ..... FIR...... · P I ^...... N FRo:;. · ...... { I I N - I .... To:;.. ...... U :l V I ...... {} R ... <br /> <br />143 Union Blvd. Suite 700 Lakewood, CO 80228 720-962-6072 <br /> <br />U.P"P.ER_ A_R_KA_N_SA_S DljV.ER_S~IO.N_ STR_UJCTU.R_E IN"V.EN.TO.R_Y. <br /> <br />Structure Name: Canon City Raw Water Diversion & Pump Station <br /> <br />Reported By: DSkuodas <br /> <br />Date: <br /> <br />4-20-05 <br /> <br />Time: <br /> <br />2:00pm <br /> <br />Directions: <br /> <br />Located west of a large Aquila industrial building that is on the south side of U,S, <br />Highway 50 on the west edge of Canon City, There is an access road to this <br />diversion, but it has a locked gate, <br /> <br />Location: <br /> <br />Latitude <br />N38d26,044' <br /> <br />Longitude <br />W105d15,411' <br /> <br />Section <br />SE 1/4 S31 <br /> <br />Township <br />18S <br /> <br />Range <br />70W <br /> <br />Type: <br /> <br />Low-Level Dam/Spillway <br /> <br />Condition: <br /> <br />Good ~ No 0 Reason Submerged: <br />Fair 00 Submerged: Yes ~ Flow is diverted into an adjacent <br />Poor building <br />Repair(s) Needed: Structure appears to be in working order and good condition, <br /> <br />Upstream Configuration: There is a concrete weir that spans the entire river, and water is diverted <br />to a building on the north bank of the river, There is a debris boon on the north side of the river that <br />helps capture debris before entering the building, <br /> <br />Comments: Most of the structures are submerged, but these facilities look to be in working order <br />and in good condition, There is a 48" R,C,P, and a 15" plastic pipe that outlet in the river <br />downstream that appear to come out of the building, <br /> <br />F:\Projects\20050492\Documents\Field Inventory Forms 4-22-05\Canon City Intake,docOA No, 2-2005-0492 <br />
The URL can be used to link to this page
Your browser does not support the video tag.