My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Upper Arkansas River Divsion 2 Diversion Structure Inventory.pd
CWCB
>
Loan Projects
>
Backfile
>
3001-3102
>
Upper Arkansas River Divsion 2 Diversion Structure Inventory.pd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2010 3:10:14 PM
Creation date
5/4/2007 11:03:13 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C154021
Contractor Name
Olsson Associates
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />June 2005 <br /> <br />Upper Arkansas Diversion <br />Structure Inventory <br /> <br />Bray Ditch <br /> <br />Narrative of Structure Components <br /> <br />The diversion structure for Bray Ditch consists of a 4' -2"x 5' -8~" cinder block <br />structure with a sluice gate. The diversion structure directs water into a 3D" CMP <br />which outlets in the ditch approximately 30' downstream. <br /> <br />The overall condition of this structure is good, and there are no improvements <br />needed at this time. <br /> <br />Summary of Recommended Repairs <br /> <br />. None <br /> <br />Estimated RanQe of Cost <br /> <br />Low <br />
The URL can be used to link to this page
Your browser does not support the video tag.