Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />6.0 OTHER STUDIE~~ <br />A flood plain delineation study conducted by Hydro-Triad, LTD., for the Ptarmigan <br />Project provides estimated the 100-year peak discharge for the Blue River downstream <br />from Dillon Dam (Hydro-Triad, 1976). However, the study, Hvdrology Report. Blue <br />River Downstream of Dillon Reservoir. Summit Countv. Colorado (Gingery, 1978b), <br />provides updated discharges based on detailed hydrologic analysis. The discharges for <br />the Blue River developed for that report are used in this study. <br /> <br />Flood boundary de:lineations for this study supersede the Federal Emergency <br />Management Agencies Flood Insurance Rate Map (FEMA, 1978). <br /> <br />This study is authoritative for the purpose of the National Flood Insurance Program; <br />data presented herein either supersede or are compatible with all previous determinations. <br /> <br />7.0 LOCATION OF DATA <br />Survey, hydrologic, hydraulic, and other pertinent data used in this study can be <br />obtained by contacting the office of the Federal Insurance Administration, Regional <br />director, Building 710, Denver Federal Center, Lakewood, Colorado 80215. <br /> <br />8.0 BIBLIOGRAPHY AND REFERENCES <br />(See TSDN reference materials.) <br />