My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rio Grande - Rio Grande Reservoir Multi-Use Enlargement_Application Addendum
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
Rio Grande - Rio Grande Reservoir Multi-Use Enlargement_Application Addendum
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2011 8:56:48 AM
Creation date
4/23/2007 10:46:46 AM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
Rio Grande
Applicant
San Luis Valley Irrigation District
Description
Rio Grande Reservoir Multi-Use Enlargement and Rehabilitation Preliminary Design
Account Source
Statewide
Board Meeting Date
3/13/2007
Contract/PO #
150402
WSRF - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mr. Travis Smith, Superintendent <br />October 16, 2003 <br />Page 8 <br /> <br />Grande Reservoir are that it would suffer evaporation at a smaller rate and that it would not be <br />subject to spill from Project Storage. It is noted that Colorado had a credit of 53,200 acre-feet in <br />Project Storage at the end of 1994 that was lost in the 1995 spill. <br /> <br />The storage of Colorado credit water would be achieved by holding the water in storage, <br />equal to the amount of the anticipated credit in the compact accounting. To the ~xtent the water <br />is held in the reservoir enlargement, the delivery obligation would be calculated under Article III <br />as if the water had not been held in storage. If the water is released in a subsequent year, it <br />would add to the physica-I water supply in the Rio Grande, but not to the delivery obligation, <br />since the delivery obligation had been paid on the water in the year it was held in storage. We <br />have assumed here that only Rio Grande credit water as determined by the Rio Grande's <br />separate Compact accounting would be available for storage in the reservoir enlargement <br /> <br />Under the current Compact administration, curtailment of Colorado water uses should <br />not result in significant credits under the Compact. Consequently, credit water would have' been <br />available for storage in the reservoir enlargement primarily when the existing reservoirs fined or <br />would have filled under current Compact administration. In addition to the years when Project <br />Storage spilled, Rio Grande Reservoir filled or nearly filled in 1948-49, 1952, 1957-58, 1962~ <br />1965~ 1970, 1973, 1997, and 1998. As noted above, water years 1946-67 were essentially <br />without Compact adn1inistration and some relatively large debits occurred and accrued as a <br />result Inspection of the annual reports of the Rio Grande Compact Commission showed that <br />'. the Rio Grande had annual credits in only 1948, 1949, and 1958. Therefore, credit water would <br />have been available for s~orage in the reservoir enlargement in these three years. <br /> <br />As indicated previously, water years 1968-85 was a period of administration under the <br />1968 Stipulation with New Mexico and Texas and significant curtailments were made to Rio <br />Grande water uses. Our examination of the Compact accounting and our curtailment <br />calculations indicated that Rio Grande Reservoir would have filled in 1970 and 1984 in addition <br />to 1973 and 1985 when the reservoir filled historically. Water would have been available to the <br />reservoir enlargement in 1985 under the Tres Rios terms and conditions as discussed earlier. <br />Therefore, credit water could have been stored in the reservoir enlargement in 1970, 1973, and <br />1984. <br /> <br />r ' ~ <br />l'>\f :~ <br /> <br />In the period of current Compact Administration after 1985, Rio Grande Reservoir filled <br />in 1986i 1987 t 1995, 1997, and 1998. Water was available to the reservoir enlargement under <br />
The URL can be used to link to this page
Your browser does not support the video tag.