My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPP287
CWCB
>
Water Supply Protection
>
Backfile
>
20000-20849
>
WSPP287
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:10 PM
Creation date
4/23/2007 9:58:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.49.J
Description
Colorado River Threatened-Endangered - RIPRAP - Price-Stubb Fish Passage - Environmental Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
12/1/2004
Author
DOI-BOR
Title
Final Environmental Assessment and Finding of No Significant Impact - RE- Providing Endangered Fish Passage at the Price-Stubb Diversion Dam on the Colorado River - 12-01-04
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001073 <br /> <br />Final Enviromnental Assessment-Chapter 2-Alternatives <br /> <br /> <br />~. ~ ~ ~ ,,,:~ ~~~/,}~ <br />I \ '1 ~ \ ~~ ~ ", '" Il)t~ ~.~~::I <br />~ '~~ _____~ =::: ~ ~~\ ,~~-\ ~\~ ~te ?~, <br />I ~ ~ ,:'" ~ ~'\~ "''' ~ ~~~ ~ <br />~ - ~ ~:::'" ~ "',,- \ '" ~. ",'-- <br />i~-~ ,~, ~ ,,~ <br />, ~ ~ ~ = ~~ .~~,.~'tt,l\ <br />~\ ,~~ ~~,~'~ ~ '\:~~\~;~ ~~~ <br />~~ ~ ~ '~"~o- \ <br />'" Canal RIght ~ '"", ~ ~ <br />~" ' ) Headworks Abutment" ~.~ "- "'- ~ , ' ~ <br />" ~ " ~ "- ~ "- "", \ ~ ~ ~ ~--:" <br />, ~ ------" -------- ~ \. ---.:::::: ~-~ '- " <br />- ~~~~~~~ ",-" ~ <br />~~~~ '" '''', ~ " <br />\~ ~ ~ ~ <br />~~ ~~~ ~( <br />'"' - <br />~ "" <br />~~ <br />~~ <br />~ <br />~~ <br /> <br /> <br />>V ..v '" :- <br /> <br />Figure 8-Dam Removal Conceptual Design Drawing <br /> <br />Removal activities would require measures, such as placement of boulders or riprap in <br />the riverbed or along the banks, to restore or enhance natural fish passage in the river <br />channel by native and endangered fish. <br /> <br />Boating safety would also be considered in removal designs (addition of boulders or <br />riprap to protect boaters from the dam abutments, and removal of hazards such as rebar <br />protruding from the remaining concrete). To the extent that costs to the Recovery <br />Program would not increase and create liability issues, designs for removal could also <br />consider incorporating measures to enhance recreational boating. <br /> <br />Measures would also be required to protect the ability of Ute Water to deliver Colorado <br />River water to their treatment plant. These possible options include; <br /> <br />1. Deliver Colorado River water to the Ute Water pump plant via the Orchard Mesa <br />Power Cana14. Water would be available year round, except for about 2 to 3 weeks in the <br />spring and fall during maintenance of the power canal and Grand Valley Power Plant. <br /> <br />Reclamation estimates this option would cost from $150,000 to $300,000. This option <br />would require the following measures: <br /> <br />4 The Grand Valley Project is not authorized to carry municipal and industrial (M&I) water. Only <br />Congress can authorize the carrying ofM&I water through the Grand Valley Project Canals. <br /> <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.