Laserfiche WebLink
<br />001066 <br /> <br />Final Environmental Assessment-Chapter 2-Alternatives <br /> <br />to private and State properties, rights-of-ways, and facilities. Following construction, any <br />damaged area would be restored, as near as practicable, to its original condition. <br />Temporary construction access to the dam would be from an existing trail that lies within <br />the railroad right-of-way that parallels the railroad tracks and through E.R. Jacobson <br />property downstream of the dam. Construction staging and material storage would be on <br />adjacent vacant land owned by Eric Jacobson. <br /> <br /> <br />Figure 5-Public Service Company of New Mexico Diversion Dam Rock Fish Passage on the San Juan <br />River, New Mexico <br /> <br />Construction access and staging areas are limited near the dam because of its proximity to <br />the railroad tracks. However, because the fish passage would be located in the river <br />channel and not between the dam, head gates and railroad; construction access would be <br />less constricted when compared to the conventional fish ladder alternative. <br /> <br />A cofferdam and/or bypass channel may be used to direct the river around the <br />construction area and river flows would not be reduced. Before construction, <br />Reclamation and the contractor would obtain necessary approvals required by the Clean <br />Water Act. Reclamation would request Section 404 authorization under Regional <br />General Permit No. 057 for projects that benefit recovery of endangered fishes. If <br />discharging water for construction dewatering is needed, the contractor would obtain a <br />Section 402 permit. Reclamation would also coordinate construction activities within the <br />IOO-year floodplain with Mesa County. Construction would be scheduled during low <br />river conditions in 2005. <br /> <br />The estimated construction cost for this alternative is approximately $4,800,000. Costs <br />for operations and maintenance for this alternative would be negligible. Recovery <br />Program cost for this alternative would be comparable to the Downstream Rock Fish <br />Passage with Whitewater Features Alternative. <br /> <br />13 <br />