Laserfiche WebLink
<br />000964 <br /> <br />Response 16.-long term control of noxious weeds with construction disturbance area was <br />added to the mitigation measures. The installation of flashboards is not included in the proposed <br />action and Response 15 addresses the loss of power revenue during construction. <br /> <br />Consultation with Other Agencies <br /> <br />Reclamation staff consulted with the Service to comply with the Fish and Wildlife Coordination <br />Act and Endangered Species Act; the Army Corps of Engineers to comply with requirements of <br />the Clean Water Act; the Colorado State Historic Preservation Officer to comply with the <br />National Historic Preservation Act; and the Redlands Water and Power Company. <br /> <br />Distribution List <br /> <br />Appendix A contains the mailing list for this final, environmental assessment. The list includes <br />all individuals, agencies and organizations to which Reclamation sent the scoping letter. In <br />addition, others who requested a copy of the draft environmental assessment are included on the <br />li~ ' ' <br /> <br />29 <br />