Laserfiche WebLink
<br />CHAPTER 3 RESULTS ..'.'...0.......................,........,..".......................,...............................,..,...........................0 32 <br /> <br />3,1 Introduction .0000 '0.0.0 ,......00 ..'.'.0 '0 '0 '0 '.'..0.0 ,..'.'.0 0 ..0....0.0.0.0. 0....0.'0 "0 00.0.. ,..,..." 00.0.0......., 00 0 o. 0.'.0 0'0 ......,...32 <br /> <br />3,2 Summary of Results Reported In Technical Memoranda Nos. 1-11................................32 <br /> <br />3,2.1 General "'0 .." .'.0..'0 0.0.0.0.0 0.0..0 ....0.. 0 ....00..'00'.00..0.'.'..0.'0.'.'0 '0.0.00 ..0.....0.. '.0..0.0 ,.......0 o. ".'.0.0 '0 32 <br /> <br />3.2.2 Alternative la: Green Mountain Reservoir Reduced Winter Power <br /> <br />Operations 0000.'0 '0..... ,.,. ,..... .....'.'.0 0 ,., '0 0..0 '.0." '.'0.0..'0.'0 "..0..'.'...0.'.0 '0 0...0 ..0.0 ....0..0............ 33 <br /> <br />Alternative la: Green Mountain Reservoir Conjunctive Pool Operations ...33 <br />Alternative 1 b: Modify Ruedi Reservoir Operations ........................................34 <br />Alternative le: Denver Water System Operations ............................................034 <br />Alternatives 1f and 19: Bypass Diversions to Storage and Reduce <br /> <br />Constraints on CROPS .0 ,....." "0 "0 00 0...0...'0 '.00.0..'0.0......0 ,.., '0 '..0 0..........0 '......0.............. 35 <br /> <br />Alternatives la, 3d and 3e: Green Mountain Reservoir Pre-emptive Release, <br />Water Carried Over and Developing Additional Yield from GVP and GVIC <br />through Increased Efficiency.. ,.., ".0.0...00.....'.'0 .0....0.0.00.....0 '.....0.........0.0..0.....0.0.0...0.36 <br />Alternatives 4f, 4g, 4k, 4m, 4n and 40: New Storage Facilities Below <br /> <br />Shoshone.,.,." '0 0.'.'...'..0.0.0 0'0 0........ 0.0...0 '0 ,.. '00.0.. .0.'0.00.'0 ..'.0..0.... .0.0.' 0...0 ,.. ,.. .0.0 ,.. ,., 0.'.'.'.0.37 <br /> <br />Alternatives ld and 5a: CBT West Slope Facilities Operations and East <br />Slope Power Operations and Scheduling..............,..............................................38 <br />302.10 Alternative 5b: Shoshone Power Plant Operations ..........................................38 <br />3,2.11 Alternative 6a: Insurance Pool..............,................................................................39 <br />Analysis of Results Obtained From Revised StateMod and Cl Data Set (Fifth <br /> <br />Revision) ... ... ...'0 '0 '0"" '0.0.0...0.'...0 '...0...0 ....... .0... '...0..0..0..00..00...0..'..0.'..............0 0.0....0....0 ..0....... 00....0.0. 40 <br /> <br />3,3.1 Comparison of Cl Data Set (Fourth Revision) with Revised StateMod and <br />Cl Data Set (Fifth Revision) ...............................................................,..................40 <br />303.2 Green Mountain Reservoir Makes 20, 000 Acre-Feet Release........................41 <br />3,3.3 "Share the Pain" Alternative ..0.....................,.........................................................41 <br /> <br />Sensitivity Analysis " '0" '..'.0..0 0......0.'.. "0 ...0.0 "0 '....'.0.0.0.0'.... 0.'00 "0 '0.'.0.0.'.'.....'.00. 0" '...0.0 ..0.0..0.0 ....0.0.0. 42 <br /> <br />3.4.1 Revised StateMod and Cl Data Set (Fifth Revision) with 111,000 Acre-Feet <br />of Additional Future Depletions ...................,.......................................................42 <br />Revised StateMod and Cl Data Set (Fifth Revision) with 111,000 Acre-Feet <br />of Additional Future Depletions and Green Mountain Reservoir Making the <br />Total 20,000 Acre-Feet Release ....0.......................,................................................42 <br />Revised StateMod and Cl Data Set (Fifth Revision) with 111,000 Acre-Feet <br />of Additional Future Depletions arid "Share the Pain" Alternative ...............43 <br />Oudet Works Iitnitations .......'......0........'0..............................................................43 <br />Modified "Share the Pain" Alternative with CROPS ........................................44 <br />Shortage to Junior Water Rights....................................,.......................................44 <br />Effects of Removal of Shoshone Priority Call on Winter Flows ....................45 <br />Effects of "Share the Pain" Alternative with 111,000 Acre-Feet of <br />Additional Future Depletions on Colorado River Flows ...............,.................45 <br /> <br />GDJ757 <br /> <br />303 <br /> <br />3.4 <br /> <br />~"""' <br />ii <br /> <br />203.16 <br /> <br />2,3.17 <br /> <br />2.3.18 <br />203.19 <br /> <br />302.3 <br />302.4 <br />3,2.5 <br />3,2.6 <br /> <br />3.2.7 <br /> <br />302.8 <br /> <br />302.9 <br /> <br />3.4.2 <br /> <br />3.403 <br /> <br />3.4.4 <br />3.4.5 <br />3.4,6 <br />3.4.7 <br />3.4,8 <br /> <br />TABLE OF CONTENTS (continued) <br /> <br />Sensitivity Analysis Procedures Concerning Potential Shortages to Junior <br /> <br />Water Rights....,..........,.. ,..,..........,.... ........... ,..... ....... ................. ..,.... ........,................ 30 <br /> <br />Sensitivity Analysis Procedures Concerning Effects of General Removal of <br />Shoshone Priority Call on Winter Colorado Riv~r Flows ..............0.................30 <br /> <br />Homestake Reservoir...o "0 "0 '...0' '.0.0.....0. "0......." "'.'.0.0".0.0.0.' '0.0.0 '0 ..0..'.0 0'0 00 0.0..'.. ,. '0 '0 00 30 <br /> <br />Granby Reservoir ,.,.,., "0 0.'..0 00 '0 0..0 00 ..0 ,..'..".0 ...'0 "..,.,.,. '0.0.'0 0.....'0 ,., '0 0.0..0......0 .... .,.. ".." 31 <br /> <br />11 <br /> <br />1), \Data \ GEN\ CWCB \ 19665\Report Phase 2\FinalReport9.03 \FinaC CFOPS_Report(9-03).doc <br />