My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPP283
CWCB
>
Water Supply Protection
>
Backfile
>
20000-20849
>
WSPP283
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:09 PM
Creation date
4/23/2007 9:58:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.39.C
Description
Colorado River Threatened-Endangered - RIPRAP - CFOPS - Water Availability
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/2003
Author
Brown and Caldwell
Title
Phase 2 Coordinated Facilities Water Availability Study for the Endangered Fishes of the Upper Colorado River - Final Report - 09-01-03
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />uJli776 <br /> <br />1.1 PURPOSE <br /> <br />CHAPTER 1 <br /> <br />INTRODUCTION AND PURPOSE <br /> <br />The purpose of this investigation is to summarize the results of a feasibility investigation of <br />19 alternatives to supply 20,000 acre-feet of water to the head of the 1S-Mile Reach for purposes of <br />recovering four species of endangered fish in the Colorado River in Colorado. This investigation is in <br />response to the findings, conclusions and of recoriunendations of the Phase 1 report for this project, <br />Phase 1 Coordinated Facilities Water Availability 5 tucfy for the Endangered Fishes of the Upper Colorado River <br />(Colorado Water Conservation Board, September 2000). These 19 alternatives include: <br /> <br />1. Expanded Coordinated Reservoir Operations <br /> <br />. <br /> <br />Alternative 1a: Green Mountain Reservoir reduced winter power operations. <br />Alternative 1a: Green Mountain Reservoir conjunctive pool operations. <br />Alternative 1 a: Preemptive release and water carried over in Green Mountain <br />Reservoir. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Alternative 1 b: Ruedi Reservoir modified operations. <br />Alternative 1d: Modify Colorado-Big Thompson (CB1) west slope facilities <br />operations. <br />Alternative 1e: Denver Water system modified operations. <br />Alternative 1 f: Bypass diversions to storage. <br />Alternative 19: Reduce constraints on Coordinated Reservoir Operations <br />(CROPS). <br /> <br />.- " <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />2. Efficiencies of Conveyance and Distribution Facilities <br /> <br />3. <br /> <br />; <br /> <br />. <br /> <br />Alternatives 3d and 3e investigated as components of 1 a: Re-analysis of Grand <br />Valley Project (GVP) and analysis of Grand Valley Irrigation Company <br />(GVIq water management for additional efficiency as a component of <br />Alternative 1 a, Green Mountain Reservoir operations. <br /> <br />New Storage Projects <br /> <br />· Alternatives 4f, 4g, 4k, 4n, and 40: New tributary storage facilities below <br />Shoshone Power Plant. <br /> <br />. <br /> <br />Alternative 4m: New main stem storage facility. <br /> <br />4. Power Plant Operations and Scheduling <br /> <br />. <br /> <br />Alternative Sa: East slope power operations and scheduling, investigated as a <br />component of Alternative 1 d: CBT west slope facilities operations. <br /> <br />10 <br /> <br />P,\Data \ GEN\CWCB\ 19665\Repon Phase 2\FinalRepon9.03\FinaC CFOPS_Repon(9-03).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.