Laserfiche WebLink
<br />000733 <br /> <br />TABLE OF CONTENTS (continued) <br /> <br />APPENDICES <br /> <br />Appendix A: Technical Memorandum No.1 Concerning Analysis of Alternative1A, Expanded <br />Coordinated Reservoir operations of Green Mountain Reservoir, Reduced\Winter Power Operations, <br />Draft December 2000, Revised October 2001 <br /> <br />Appendix B: Technical Memorandum No.2; Analysis of Alternative lA, Expanded Coordinated <br />Reservoir Operations of Green Mountain Reservoir, Including Green Mountain Reservoir Preemptive <br />Release and Release of Water Carried Over in Green Mountain Reservoir, Draft March 2001, Revised <br />October 2001 <br /> <br />Appendix C: Technical Memorandum No.3: Analysis of Alternative lA, Expanded Coordinated <br />Reservoir Operations of Green Mountain Reservoir, Conjunctive Pool Operations, Draft March 2001, <br />Revised October 2001 <br /> <br />Appendix D: Technical Memorandum Noo 4: Analysis of New Storage Facilities Below Shoshone, <br />Draft March 2001, Revised October 2001 <br /> <br />Appendix E: Technical Memorandum No. 4a: Analysis of Alternative 4, New Storage Facility at <br />Webster Hill Site, Mainstem Colorado River, Draft June 2001, Revised October 2001 <br /> <br />Appendix F: Technical Memorandum No.5: Analysis of Alternative lb, Expanded Coordinated <br />-Reservoir Operations of Ruedi Reservoir, Draft June 2001, Revised October 2001 <br /> <br />;:;:':'-:') <br /> <br />Appendix G: Technical Memorandum No, 6: Analysis of 2001 Spring Peak Flow conditions and <br />Comparison to Results of State Mod Modeling for CFOPS Alternatives Investigation, Draft June 2001, <br />Revised October 2001 <br /> <br />Appendix H: Technical Memorandum Noo 7: Investigation of Alternative H, Bypass Diversions to <br />Storage and Alternative 19, Reduce Constraints on CROP, October 2001 <br /> <br />Appendix I: Technical Memorandum No, 8: Investigation of Alternatives 1d, CBT West Slope <br />Facilities Operations, and Alternative Sa, East Slope Power Operations and Scheduling, October <br />2001 <br /> <br />Appendix J: Technical Memorandum No.9: Investigation of Alternative Sb, Expanded Coordinated <br />Reservoir Operations, Shoshone Power Plant, October 2001 <br /> <br />(I <br /> <br />Appendix K: Technical Memorandum Noo 10: Investigation of Alternative 6a, Insurance Pool, <br />October 2001 <br /> <br />Appendix L: Technical Memorandum Noo 11: Investigation of Alternative 1e, Expanded <br />Coordinated Reservoir Operations, Denver Water Systems Operations, October 2001 <br /> <br />Appendix M: Technical Memorandum No. 12: Comments and Responses to Comments Received on <br />Draft, January 2003 Phase 2 Coordinated Facilities Water Availability Study for the Endangered Fishes <br />of the Upper Colorado River Final Report, March 2003 <br /> <br />P: \Data \ GEN\CWCB\ 19665\Report Phase 2\FinalReport9.03 \Final_ CFOPS_Report(9-03).doc <br /> <br />V111 <br />