Laserfiche WebLink
<br />000753 <br /> <br />Table 1 <br />Table 2 <br />Table 3 <br />Table 4 <br />Table 5 <br />Table 6 <br />Table 7 <br />Table 8 <br />Table 9 <br />Table 10 <br />Table 11 <br />Table 12 <br /> <br />Table 13 <br />Table 14 <br /> <br />Table 15 <br /> <br />iL0 <br /> <br />Ii <br /> <br />TABLE OF CONTENTS (continued) <br /> <br />LIST OF TABLES <br /> <br />Water Rights Summary <br />Summary of Cl Data Set Revisions \ <br />Estimated CROPS Bypasses/Releases (Acre-Feet) <br />Summary of Shortages to Junior Water Right Priorities <br />Release Capacity Calculations for Green Mountain Reservoir <br />Release Capacity Calculations for Ruedi Reservoir <br />Release Capacity Calculations for Wolford Mountain Reservoir <br />Release Capacity Calculations for Williams Fork Reservoir <br />Release Capacity Calculations for Granby Reservoir <br />T otal Available Capacity During 10- Day Peak from All 5 Reservoirs for Period of Study <br />Potential CROPS Release for Share the Pain Alternative for 10-Day Peak <br />Potential Total CFOPS and CROPS Release for Share the Pain Alternative for 10-Day <br />Peak <br />Effects on Winter Colorado River Flows from Removal of the Shoshone Priority Call <br />Effects on Colorado River Flows at Head of is-Mile Reach from Share the Pain <br />Alternative with 111,000 AF of Future Demands <br />Summary of Alternatives <br /> <br />tv <br /> <br />P: \Data \ GEN\ CWCB\ 19665 \Report Phase 2\FinalReport9.03 \ Final_ CFOPS_Report(9-03).doc <br />