My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPP282
CWCB
>
Water Supply Protection
>
Backfile
>
20000-20849
>
WSPP282
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:09 PM
Creation date
4/23/2007 9:57:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.39.C
Description
Colorado River Threatened-Endangered - RIPRAP - CFOPS - Water Availability
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
3/1/2003
Author
Brown and Caldwell
Title
Phase 2 Coordinated Facilities Water Availability Study for the Endangered Fishes of the Upper Colorado River - Tech Memo Number 12 - Comments-Responses to 01-01-03 - Draft - 03-01-03
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OOLJ722 <br /> <br />2.2.3 Evaluation and Screening Criteria <br /> <br />Participants in this Phase 1 investigation indicated the importance of three criteria for evaluating and <br />screening alternatives: <br />. Reduction in existing projects' yields is not to occur, <br />. Existing projects' operations and maintenance costs should not be increased, and <br />. Existing projects operational flexibility, and/or reliability are not to be affected. <br /> <br />Analysis has been completed in Phase 2 to help quantify these evaluation criteria for the alternatives <br />to supply the average annual 20,000 acre-feet. <br /> <br />2.2.3.1 Impact on Existing Projects' Yields. The term "yield" is used in this investigation to <br />indicate the historic yield of a project under historic hydrologic conditions and does not refer to the <br />decreed yield of the project's water right. In Phase 2 of this investigation, extensive analysis has been <br />completed to determine the effect, if any, of implementing the alternatives described in this report on <br />existing projects' yields and storage. These effects were determined by comparing hydrologic model <br />simulations with and without the proposed alternatives. <br /> <br />2.2.3.2 Effect on Existing Projects' Operations and Maintenance Costs. Analysis of effects of <br />alternatives on existing projects' operations and maintenance costs has been completed as part of this <br />investigation in those situations where operations and maintenance costs could be affected. <br /> <br />2.2.3.3 Effect on Existing Projects Operational Flexibility or Reliability. Analysis of effects of <br />alternatives on existing project operational flexibility or reliability has been completed as part of this <br />investigation in those situations where operational flexibility or reliability could be affected. <br /> <br />2.2.4 RIPRAP Alternatives <br /> <br />The feasibility of expanding or modifying certain of the RIPRAP alternatives as listed in the PBO and <br />the Recovery Implementation Program (U.S. Fish and Wildlife Service, December 20, 1999) was <br />considered and these alternatives were investigated. Yield available from a specific modification <br />and/ or expansion of the RlPRAP alternatives is counted toward meeting the 20,000 acre-feet target if <br />(1) this yield was in addition to the yield of the original RIPRAP alternative and (2) the <br />modified! expanded alternative would not diminish the yield of the original RIPRAP alternative. <br /> <br />.. <br /> <br />2.2.5 <br /> <br />Incentives for Participation <br /> <br />Participation in actions identified in the PBO is voluntary. The PBO examined both existing and <br />future depletions on the Colorado River and its tributaries upstream of the confluence of the <br />Gunnison River associated with Federal, State, and private projects which rely on, or will rely on, the <br />Recovery Action Plan (RAP). The Service believes that these RAP items are sufficient to avoid the <br />likelihood of jeopardy and/or adverse modification of critical habitat from: (1) depletions occurring <br />as of September 30, 1995 from existing individual projects, and (2) future depletions up to <br />120,000 acre-feet/year. Individual Section 7 consultation will still be required on specific Federal <br /> <br />P:\Data \GEN\CWCB\19665\Repon Phase 2\FinalRepon12.02\Finat Draft _ Repon(l-03),doc <br /> <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.