Laserfiche WebLink
<br />Ou1545 <br /> <br />Dam Removal <br /> <br /> <br />~ <br />~. ~ <br />.v '" '" t <br /> <br />~ '" <br /> <br />Figure 3 - Conceptual Design for Dam Removal <br /> <br />River flow <br />. <br /> <br />Dam crest <br /> <br />Riverbed <br /> <br />20 ft <br /> <br /> <br />1 <br /> <br /> <br />Areas that would be mnoved ~ <br /> <br />Dam foundation <br />(would not be mnovcd) <br /> <br /> <br />Riverbed <br /> <br />I. <br /> <br />40 ft <br /> <br />.1 <br /> <br />Figure 4 - Cross-section view of Price-Stubb Diversion Dam <br /> <br />13 <br />