Laserfiche WebLink
<br />9J\L <br /> <br />SMITH WILLIAMS CONSULTANTS, INC. <br /> <br />304 Inverness Way South. Suite 490 · Englewood, Colorado 80112-5828 <br />Phone: (303) 433-0262. Fax: (303) 433-0362 <br /> <br />December 18, 2006 <br /> <br />Proposal P06-078 <br /> <br />Mayor Tom Huerkamp <br />Orchard City Town Hall <br />2102 J50 Road <br />Orchard City, Colorado 81410 <br /> <br />Re: - Orchard City Reservoir Proposal for Engineering Services <br /> <br />Dear Mayor Huerkamp: <br /> <br />Scope of Work <br /> <br />Smith Williams Consultants, Inc. (Smith Williams) is pleased to present this proposal to Orchard <br />City for engineering services related to the Proposed Reservoir for Orchard City. This proposal <br />focuses on an alternative analysis for determining the most cost efficient dam structure for the <br />proposed reservoir and the fmal engineering design for the selected alternative. <br /> <br />As part of the proposed scope of work, Smith Williams will prepare detailed fmal design <br />documents, which will be adequate to obtain approval from the State Engineer's Office and the <br />generation of construction bidding documents. <br /> <br />Task AIOO: Progres~ Meetings: <br /> <br />.The Project Manager will conduct conference calls with an Orchard City representative to review <br />progress on a weekly basis. Project coordination meetings will be conducted as required to <br />complete the final design. A formal presentation to Orchard City will be required following the <br />completion of the final design. <br /> <br />. <br /> <br />Weekly Meetings ~ The primary topics of discussion will be progress to date, progress <br />planned for the next period, maintenance of an action item log, and information needs by <br />the team members or Orchard City to maintain progress. Tbe.intent is to notify Orchard <br />City's P.M. as soon as any information or action requirement is determined. Action <br />items will only be formalized at the meeting. The' Project Manager will attend all Weekly <br />Meetings, and the Principal-In-Charge will attend as needed, anticipated to be once per <br />month and participate via conference call in all otherweekly meetings. <br /> <br />. <br /> <br />Submittal Review Meetings - It is anticipate'd that two submittal review meetings will <br />be held, one for the Design Criteria (Task A200) and a second for the Draft Final D~sign <br />(Task 500). Following review of the submittals, Orchard City will provide its written <br />comments to the Engineer. It is estimated that the review meeting will be held <br />approximately one week after the Engineer .receives comments on the submittal. <br /> <br />S:\PROPOSALS\2OOe proposals\p06-078 - orcharQ clty I'9seN0ir\p06.Q78 ..on:J1ard city re:servoir.~ <br />