My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gunnison - Lake San Cristobal Full Application
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Gunnison - Lake San Cristobal Full Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:56:29 PM
Creation date
4/17/2007 11:24:24 AM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Gunnison
Applicant
Hinsdale County and Upper Gunnison River Water Conservancy District
Description
Lake San Cristobal Project
Account Source
Basin
Board Meeting Date
5/22/2007
Contract/PO #
8000000021
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Supply Reserve Account - Grant Application Form <br /> <br />Form Revised October 2006 <br /> <br />3. Please provide an overview of water project or activity to be funded including - type of activity, statement of what <br />the activity is intended to accomplish, the need for the activity, the problems and opportunities to be addressed, <br />expectations of the participants, why the activity is ilnportant, the service area or geographic location, and any <br />relevant issues etc. Please include any relevant Tabor issues. Please refer to Part 2 of criteria and guidance <br />document for additional detail on information to include. Attach additional sheets as needed. <br /> <br />Hinsdale County and the Upper Gunnison River Water Conservancy District (UGRWCD) are <br />examining the feasibility of constructing a new permanent control structure at the outlet of lake <br />San Cristobal. This control structure would serve to regulate the lake level, provide release of <br />water from the lake, and prevent failure of the lake outlet structure during flood events. <br /> <br />The stored water resulting from this project will be used primarily for augmentation purposes within <br />the lake Fork of the Gunnison River. Other beneficial uses may include agriculture and recreation. <br />Some discussions with CWCS staff have included allocating some of the releases to support <br />instream flow water rights in the lake Fork. <br /> <br />This is the second segment of an ongoing feasibility study and consists of two analyses that will <br />be performed simultaneously. The first analysis is to estimate the firm yield of the 960 acre-feet of <br />proposed storage and develop an engineering report to support the water right application in Case <br />No. 03CW108. The second wilt analyze the current and future market for water impounded by the <br />structu re. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.