Laserfiche WebLink
<br /> <br />. -, . -,' <br />~ . , , <br /> <br />Greeley and Loveland Irrigation Company <br />January 22.23, 2003 <br /> <br />Agenda Item 19c <br /> <br />Water Project Construction Loan Program.ProJect Data <br /> <br />Borrower: Greeley and Loveland Irrigation Co. County: Larimer <br /> <br />. Project Name: Boyd Lake Low-level Ou~et Project Type: Rehabilitation/Replacement <br /> <br />Drainage BasIn: South Platte Water Source: Big Thompson River <br /> <br />Total Project Cost: $1,345,000 Funding Sources: CWCS, GLlC <br /> <br />Type of Borrower: AgriculturaVMunicipal Aver. Delivery: 37,812 acre-feet <br /> <br />CWCS Small Project Loan: $1,000.000 <br /> <br />Interest Rate: 3.25% <br /> <br />Term: 30 years <br /> <br />The Greeley and Loveland Irrigation Company (GLlC), and its sister company the Seven Lakes <br />Irrigation Company, own and operate an extensive system of reservoirs and canals in the Loveland <br />and Greeley area. GLlC owns Boyd Lake, the largest reservoir in the GLlC system, with a surface <br />area of 1,750 acres and a capacity of 48.874 acre-feet. The GLlC is applying for a $1,000,000 <br />Small Project Loan from the Construction Fund to replace the existing low-level outlet works at the <br />Boyd Lake Dam. The existing outlet works is in poor structural condition, and deficiencies include <br />significant cracking, holes and leaks, and substantial sediment accumulation. Downstream of the <br />embankment the existing pipe is collapsing In some areas. The proposed low-level outlet works will <br />consist of 300 feet of 48. diameter concrete mortar-lined (CML) steel through the dam <br />embankment, and will be controlled by a 48" sluice gate, located in a gate chamber. The 50 feet of <br />CML steel pipe leading into the chamber will be encased in concrete, and the remaining 250 feet of <br />CML steel pipe installed using microtunneling technology. Downstream of the embankment, the <br />steel pipe would transition into 1600 feet of 48- reinforced concrete pipe (RCP). discharging into a <br />stilling basin 200 feel upstream of U.S. Highway 34. <br /> <br /> <br />t8~: <br />!' ~~ <br />( ~.. <br />/ <br /> <br />W_1I.1'11 <br /> <br />. <br />. <br /> <br />R_. <br />. <br />. <br /> <br />Location Map <br /> <br />Page 7 of 7 <br /> <br />