My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01869
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJ01869
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:49 AM
Creation date
4/9/2007 2:52:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0065FX
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'. <br /> <br />ST A TE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />February 20,2003 <br /> <br />Bill Owens <br />Governor <br /> <br />Mr. Ron Brinkman <br />General Manager & Secretary/Treasurer <br />Greeley and Loveland Irrigation Company <br />808 23rd Avenue <br />Greeley, Colorado 80631 <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />RE: Loan to Replace Low-Level Outlet Works at Boyd Lake <br /> <br />Dear Ron: <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board (CWCB) approved your Small <br />Project Loan request on January 23, 2003. The loan is to replace the low-level outlet structure at Boyd <br />Lake. <br /> <br />The Board approved a Small Project Loan from the Construction Fund in a maximum amount of <br />$1,000,000, with loan terms of3.25% per annum for 30 years. The approval includes the provision for <br />a 1 % ($10,000) loan service charge, which may be paid at closing, or financed along with the loan. I <br />have attached a copy of the updated Board memo that includes a section "Action taken by the CWCB <br />on January 23, 2003." Please note the approval conditions that require coordination with the State <br />Engineer's Office on the design waiver, as well as coordination with State Parks on the project <br />schedule. <br /> <br />When the Board approves a loan there remain several conditions: <br /> <br />a) A Feasibility Study is required. Bruce Johnson has reviewed the study titled <br />"Feasibility Study for Boyd Lake Dam Low-Level Outlet Works - December 17, 2002. " <br />Please continue to work with Bruce on the minor revisions necessary to finalize this <br />report. The report, in combination with the CWCB board memo dated January 10,2003 <br />will meet the requirements of the CWCB Construction Fund Guidelines for feasibility <br />studies. <br /> <br />b) An approved contract must be in l'lace before funds can be advanced. Jan lllian will <br />place this project on our contracting "hot list" and will initiate the loan contracting <br />process. Once the contract is finalized the Company may request loan funds to cover <br />eligible project expenses. For future reference Jan's phone number is 303-866-3462. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.