Laserfiche WebLink
<br />;:-::-... <br /> <br />,..- . <br /> <br />'5. Please indicate: The number of shareholders: <br />or <br />The number of customers: (5) See Division of Water Resources <br />Smith Ditch historical diversion data <br />6. What is the purpose of this project? Check &He? list of diverters. Exhibits "B"&"C". <br />_ New project <br />~ Rehabilitation or replacement of existing facility <br />_ Enlargement of existing facility <br />_ Emergency repair <br />_ Other (please describe) <br /> <br />7. If the project is for rehabilitation of an existing dam. is the dam currently under a <br />restriction by the State Engineer? N/A <br /> <br />8. General location of the proposed project. Include county and approximate distance and <br />direction from the nearest town or city: Routt County - 6 miles east of Craig ~ <br />2 miles north of Highway 40 on Elkhead River. Exhibit "D". <br /> <br />9. Please provide a brief narrative description of the proposed project including purpose, <br />facilities, types of water use to be served, and service area (if known at this time). Attach <br />additional pages, maps, or drawings as needed. <br />The protect would envolve thecons~ruction of a new concrete headgate <br />located down stream of the existing structure where the channel narrows. <br />This structure 70ft wide, would be capable of passing a 100 year <br />predicted flow. It woWId be designed to back. water up to the existing headgate. It <br />would be designed to pennit diversions during periods of low rlver tlow. <br /> <br />10. Please list any preliminary analyses or investigations which have been done or are in <br />progress for the proposed project along with the names of the persons or firms who prepared <br />the analyses SllhmittPd hp-rF!Wi th i!; a prelirni.nary design by the Natural Resources <br />Conservation Servire (NRCS) . Exhibit "E' ~ ._/ Estirrated total project cost <br />$ 145,000. --- <br /> <br />11. If preliminary cost estimates have been made, indicate the estimated cost of the project:_ <br />The five ditch owners will form the Smith Ditch Company who will be <br />responsible for the repayment of a $40,000, 20yr. loan from CWCB. ** <br />12. Are you intending to apply for a feasibility study loan from the CWCB Construction <br />Fund? 0 <br /> <br /> <br />7.. 7 lec("n1p~ /9Cj,( <br />Date <br /> <br />** See Exhibit "J;'" for Financial Program. <br /> <br />1:\wctrans\secb\preapp.mis <br />