My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150002 Application
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C150002 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2011 3:34:40 PM
Creation date
4/5/2007 9:55:49 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150002
Contractor Name
Grand Valley Water Users' Association
Contract Type
Grant
Water District
0
Bill Number
SB 97-8
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Grant Application <br />Grand Valley Water Management Project <br /> <br />4 <br /> <br />will be lined as part of the Colorado River Salinity Control Program to control seepage. Plans are <br />to place all laterals, including those served by the Middle Government Highline Canal, in pipe. <br /> <br />East End Government Highline Canal' The first 10 mi. of the Government Highline Canal <br />is referred to as the East End Government Highline Canal (East End). The initial design capacity <br />of the canal is about 850 ft3/S. This portion of the canal also serves the lands of Mesa County and <br />Palisade Irrigation Districts. About 120 ft3/s is delivered to the districts during the irrigation <br />season. The last 8 miles of the East End have been membrane lined. <br /> <br />Middle Government Highline Canal: The next reach ofthe Government Highline Canal is <br />the Middle Government Highline Canal. The design capacity at the beginning of this section is <br />730 ft3/S. This 20 mi. reach of the canal delivers water to 54 laterals and about 12,300 ac. It is an <br />unlined canal with no check structures. The required water surface elevation in the canal is <br />maintained by adjusting the amount of water in the canal. The Middle Government Highline <br />Canal is not scheduled for improvement. <br /> <br />Stage One: The next 7 mi. of the Government Highline Canal is called Stage One. The <br />design capacity of the beginning of Stage One is 360 ft3/ s. This section of canal delivers water to <br />12 laterals and about 6,300 ac. All the laterals in this section of canal have been placed in pipe. <br />The canal is concrete lined and has four check structures which can maintain the upstream water <br />surface elevation regardless of canal flow. <br /> <br />West End Government Highline Canal: The last 8 mi. of canal is called the West End <br />Government Highline Canal (West End). The design capacity of the beginning of the West End is <br />160 ft3/S. It delivers water to 9 laterals and about 5,200 ac. All the laterals in the West End have <br />been placed in pipe. The canal is membrane lined and has four check structures which can <br />maintain the upstream water surface elevation regardless of canal flow. <br /> <br />WATER MANAGEMENT IN THE GARFIELD GRAVITY DIVISION <br /> <br />Operation ofthe current system has been described by the manager of the GVWUA as an art. <br />The intricacies and "art" of daily operations are extensive. This art is developed through years of <br />observation of how the system responds to various conditions. It is through this experience that <br />the manager makes daily decisions on how the canal should be operated. And it is the <br />accumulation of this observed knowledge that makes the science of water management difficult. <br /> <br />Historic Water Management <br /> <br />During the early part of the irrigation season, about 1 April through 1 May, there is usually an <br />abundant supply of water in the Colorado River. During this period, irrigation demand is often <br />
The URL can be used to link to this page
Your browser does not support the video tag.