Laserfiche WebLink
<br />CWCB Co struction Fund Loan Application <br /> <br />Form Revised March 4, 1998 <br /> <br />3. Ifth project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />stor ge restriction order from the State Engineer? YES.x. NO_ <br /> <br />4. <br /> <br /> <br />5. Pie se provide a brief narrative description of the proposed project including purpose, <br />nee , facilities, types of water uses to be served and service area. (Attach separate sheet, <br />ifn eded.): See Attachment 5, a description of the proposed project, purpose and need. <br /> <br />Average water diverted per year <br /> <br />Acre-feet. <br /> <br />6. Wi I the acquisition of additional water rights be necessary? <br />S _ NO -X- If"YES", please explain: <br /> <br />7. PI ase list the names and addresses of any technical or legal consultants retained to <br />re resent the applicant or to conduct investigations for the proposed 'project: <br />ADDRESS and TELEPHONE <br />4582 South tnster Street <br />I r <br /> <br /> <br />1775 Sherman Street, #1300 <br />Dn r 0 3 <br />.303-861-1963 <br /> <br /> <br />3 <br />