My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150154 Letter of Sustaintial Completion
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150154 Letter of Sustaintial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:58:50 AM
Creation date
4/3/2007 8:32:18 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150154
Contractor Name
Pine River - Bayfield Ditch Company
Contract Type
Loan
Water District
31
County
La Plata
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Colorado Water Conservation Board <br /> Project Expenditure Schedule <br /> Pine River - Bayfield Ditch Company Siphon Project <br /> Ore. Proi. Accountine Actual Proi. Accountine <br />Sponsor: Pine River - Bayfield Ditch Co. Loan Contract No.: C150154 C150154 <br />Address: P.O. Box 3345 Authorization: $232,300.00 $232,300.00 <br /> Durango, Colorado 81302 Contract Amount $230,000.00 $230,000.00 <br />Contact: Ken Beck, President Loan Service Fee $2,300.00 $2,300.00 <br />Telephone: 970-759-6868 Total Loan Amount $232,300.00 $232,300.00 <br />Fax: No Electronic Fund Transfer Interest 2.75% 2.75% <br /> Term 30-years 30-years <br /> Condition Up to 90% Up to 90% <br /> Tax J.D. No.: 84-0483300 84-0483300 <br /> Substantial <br />E-mail: kbeck@uc,usbr.aov Completion Date: 7/1/2006 <br /> Balance <br />Loan Disb. Amount Cumulative Loan Available to Accrued <br />No. Date Description Disbursed Balance Loan Interest Interest <br /> $ 232,300.00 <br />1 12/3/2003 Construction Materials $ 65,955.00 $ 65,955.00 $ 166,345.00 $ 4,676.03 $ 4,676.03 <br />2 2/1 0/2005 Design and Construction $ 72,951.25 $ 138,906.25 $ 93,393.75 $ 2,781.14 $ 7,457.17 <br />3 3/14/2005 Construction $ 54,180.00 $ 193,086.25 $ 39,213.75 $ 1,934.89 $ 9,392.06 <br />4 9/22/2005 Construction $ 36,913.75 $ 230,000.00 $ 2,300.00 $ 784.29 $ 10,176.36 <br />Org. 9/22/2005 1 % Loan Origination Fee $ 2,300.00 $ 232,300.00 $ - $ - $ 10,176.36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.