Laserfiche WebLink
<br />~ <br /> <br />ST A TE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />August 21, 2006 <br /> <br />Bill Owens <br />Governor <br /> <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT <br /> <br />Russell George <br />Executive Director <br /> <br />Mr. Dean Wolcott, President <br />Lower Bauer West Lateral Inc. <br />P.O. Box 308 <br />Mancos, CO 81328 <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Re: Contract Number C150186 - Lower Bauer West Lateral Ditch Rehabilitation <br /> <br />Rick Brown <br />Acting Deputy <br />Director <br /> <br />Dear Mr. Wolcott: <br /> <br />This letter is to advise you that the work described in the above referenced Contract was substantially completed as of <br />August 1,2006. <br /> <br />In accordance with the Contract, the Lower Bauer West Lateral Company owes $3,348.39 for interest during <br />construction, as calculated on the attached spreadsheet. Payment in the amount of $3,348.39 for interest during construction was <br />received and was credited to your account on June 26, 2006. <br /> <br />As outlined in the Promissory Note, Appendix A of the Amended Contract, your first loan payment in the amount of <br />$4,078.94 is due on August 1,2007. A principal payment of$111,576.56 (NRCS grant funds) was received and applied to your <br />loan balance of $196,950.00 on June 26, 2006. This payment resulted in a fmalloan balance of $85,373.44, which your annual <br />payment is based on. A 1 % loan origination fee of $1,950.00 was charged to your account. The origination fee was based on <br />your highest cumulative loan balance of$195,000. <br /> <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.16, please note that the <br />renewed insurance certificates need to be provided to the Colorado Water Conservation Board annually. <br /> <br />It has been a pleasure of the Colorado Water Conservation Board to work with the Lower Bauer West Lateral Company <br />on the successful completion of this project. Please call if you have any questions regarding this matter or if we can be of service <br />to you in the future. <br /> <br />~~~ <br /> <br />Mike Serlet, P.E. <br />Chief, Water Supply Planning and Finance Section <br /> <br />cc. Don Schwindt, CWCB Board Member <br />Water Supply Planning and Finance Section <br />Project file <br />Contract file <br /> <br />Contract Amount <br />Expended Amount <br />Final Loan Amount <br /> <br />= $196,950.00 <br />= $196,950.00 <br />= $85,373.44 <br /> <br />Flood Protection. Water Supply Plarming and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Plarming <br />