My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150208 Letter of Substaintial Completion
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150208 Letter of Substaintial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 10:08:30 AM
Creation date
4/3/2007 8:27:55 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150208
Contractor Name
High Line Canal Company
Contract Type
Loan
Water District
17
County
Otero
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />August 17, 2006 <br /> <br />Bill Owens <br />Governor <br /> <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT <br /> <br />Russell George <br />Executive Director <br /> <br />Mr. Dennis Tabor, Secretary <br />High Line Canal Company <br />P.O. Box 800 <br />Rocky Ford, CO <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Re: Contract Number C150208 - Siphon Replacement Project <br /> <br />Dear Mr. Tabor: <br /> <br />Tbis letter is to advise you that the work descnbed in the above referenced Contract was substantially completed as of <br />August 1,2006. <br /> <br />In accordance with the Contract, the High Line Canal Company owes $4,328.33 for interest during construction, as <br />calculated on the attached spreadsheet, due by September 1, 2006. Make your check payable to the Colorado Water <br />Conservation Board and include the loan contract number on the check. <br /> <br />As outlined in the Promissory Note, Appendix 2 of the Contract, your first loan payment in the amount of $28,723.90 is <br />due on August 1, 2007. Please see the attached Loan Repayment Schedule and a copy of the Promissory Note. A 1% loan <br />origination fee of $4,540.00 has been added to your principal balance for a fIna110an balance of$458,540.00. The origination fee <br />was based on your cumulative loan balance of$454,000.00. <br /> <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.6, please note that the <br />renewed insurance certifIcates need to be provided to the Colorado Water Conservation Board annually. <br /> <br />It has been a pleasure of the Colorado Water Conservation Board to work with the High Line Canal Company on the <br />successful completion of this project. Please call if you have any questions regarding this matter or if we can be of service to you <br />in the future. <br /> <br />Sin, cerel/ /, ( L <br />+<J# <br /> <br />Mike Serlet, P .E. <br />Chief, Water Supply Planning and Finance Section <br /> <br />c. Harold Miskel, CWCB Board Member <br />DNR Accounting <br />Water Supply Planning and Finance Section <br />Project file <br />Contract fIle <br /> <br />Contract Amount <br />Expended Amount <br /> <br />= $458,540.00 <br />= $458,540.00 <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.